~
? ©
ee
t
e
rs e
{
wet
.
?
|
;
oe
#
S
oe
:
oP
(f) Insure that samples will not present a radiological
hazard on the return flight as a result of improper
packaging.
- of
.
.
BS
"+
(g) Assure the departure of four (4) R6D sample return
.
-
.aircraft from ENIWETOK ISLAND on the following
mo
schedules
=
4
.
].- Two (2) aircraft as early ss H/5 200, tobe
’
determined by progress of samplings
2. One (1) aircraft departs ENIWETOKapproximately H436%00,
“3.
2
\
One (1) adroraft departs ENIWETOK approxi=
mately H/72:00,
.
(3) “The MATSwill arrange for the arrival of sample return”
-
aircraft at ENIWETOK on the following schedules .
.
.
van
.
.
t
Ty
(a) Priority I trips will arrive at 0600M on D-2 days
and will be operated with heavy type transport
.. equipment. —
oy
.
'
;
2
&S
we
oo
'
g
cs)
.
§
.
,
.
.
.
-,
¢
"
Ot
- 7
(b) Priority II trip will be in“position and ready for
departure at ENIWETOK ISIAND with a back-up air-_
,
(ce)
craft at KWAJALEIN ISLAND at 1800M on D-Day and
will be operated with medium type transport
uipment
equipment,
ee
.
.
“i,
‘
nn
a
Set,
Priority III trip will be in position and ready for
.
‘departure at ENIWETOK ISLAND at 0600 on D43 days and =
will -be operated with medium type transport equipment. cif
3. ‘ PROCEDURES: ‘Specific detailed operating proced
ures for
the accomplishment of the above will be prepared by theTest Unit
responsible,
;
oe
-
HOWELL M.. ESTES, SR,
os
Commander
Brigadier General, U.S. A. F,
_ OFFICIAL:
Lt Colonel, USAF -~
Director of Operations
“TASK GROUP 7.4."08%
OPRS ORDER NO. 554°
ANNEX R > ee
wh ye
~
oo
Sa