SECTION IT
PLANNING AND PROGRESS

A.

COST_AND FUNDING.

:

Cost Revorts = Task Grouv costs attributable to IVY as’ reported
for May 1952 were:
Operating
se ee MPR OR SRE“HR s

Capital

15,787.00

= 753.00J

2 » 540.00

Cumulative costs throug’ 31 May 1952 were:

Operating
Capital

27,963.00

38,210.00

:

Requirements, = In resnonse to a directive,
a listed estimate of extra military reouirements for the Task Group

June 1952. The total of the estimates was $71,,500, the bulk of which
would be required to represerve small craft, depreserved for Operation IVY.
B.

PERSONNEL POLICIES AND PERSONNEL ADMINISTRATION.

|

Aside from the Task Group Commander's Staff and Enlisted Flag Allowance, the Boat Pool and the Underwater Detection Unit, personnel admine
istration will remain with the Fleet type commanders for all ships andé
units assigned to the Task Group.

A reconmendation was made to, and approved by Commander Service Force,
Pacific Fleet, in his capacity as Fleet Personnel Officer, to have personnel
accounting for the above named units to be handled as followss—

Enlisted Flag Allowance - by the Task Group Flagship (USS RENDOVA)
27.

vy
re

YE aes amen

during, FY 1953 was submitted to Commander Joint Task Force 132 on 11