Pricer to departure fron the forward area instrustions were issued in the
following matters regarding the rolleup:

(a) All units holding material on a loan basis were directed to return
same to the proper accountable officcr.
(b) General disposition instructions were given to all uni:s for
materials provided by CTG 132.3 including: .

1,

Ships washdown equipment. ~-

2. Instruments fron TO 132.3 Radiac Mol.
3.

Tools and calibration sources.

4.

Special protective clothing allowances.

5.

Wigh Density goggles and film badges.

6.

Classified matter originated by CTG 132.3.

e

(c) Specific instructions wore provided for the following items:
1.

Disposition for admirals barge, staf? vehicles and staff boat.

2.

Disposition of 2 LCP 's temporarily assigned to FSTES (CJTF

staff boats).
3.

BEST AVAILASLE Copy

Return of all Task Sroup recreational material to NSC, Pearl

Harbor, T. H., marked for ComServPac.
4.e

—

Ddeposition inotructions were provided for following items

in connection with boat pool.

»

a.

Exchange LCPL with CTG 132.2 for motor whale boat.

be

Exchange 2 ICMs with CTC 132.2.

oc.

Transfer 2 fuder AVRs to CTG 132.2 for retention in for-

ward area.

Transfer of 61OMs ta Holmes and Narver in forward are.

156

oe

Select target paragraph3