i
RE
moe
=
.
fod a Ma
aati
atheay pt ‘ys RE as ee
etweRESSee-
2)Lo 1 Haigh
sete
soa
wed ay whit
NR
sae
ar
Migr
age? ot
” RK
a
gk
3 sss
~gptegrti.on
ge "ResES
Fe RL
wee
en,
re,
a
The L-3 Section UGRL will have representatives gtSoth atolis. The
Sack “geimary responsibility of the L-3 representatives on these atolls is to esure
that the recuirements of Task Units 12 and 14 ers met and that these recuirer nts
are integroted into the overe)] pins ani osecions effort of TG 7.1. ihile
the menbers are primarily interested in L-3 UCL requirements and support, it
has been agreed by J-3 LASL and L-3 ‘UCRL that 211 mexbers of botr sections wi. *
work a8 a team with the objecuvive cf ensu: lig t1a% Te3k Group 7.4 receives th..
plans and operations sunort necessary to accomnlish the mission.
5.
IAndividrvsel Beszonel:ilities and Iszaticns
(1) P. 2. Hoceer, J-3 TG 7.1 4s resnosible Jor the dircetion,
coordination aid sapervision cf the J=3 effort fsr O cration CASTLE
(2. Lb. S. Themason, 1-3 UCRL is respo: sible “or ensuriny that “he
UCRL recuirement:. are iutegrcted inte the overc:1 TG ’.1] effort.
will Se prirarilr st Ferry Island.
His 2 catic
BIRIN” ATOLL= 7) Rt. Tess
Name
(a)
ow. T. Lerwir.
(b) R. MN. lerley
(2)
<irection and coordination of .-e
J-3 efJors ai Eikini Atc J.
() Sffeat-12 surnort
(2)
Soord::ationof trailer sovemen
(c) o&. Scarlett (Asst, in3 UCRL)
(2)
Coordination and sapervision ¢:
(d)
¢, Lyor.
(3) Evacuation planning and prepar ion
(e)
G. Alexandex-
{f}
TU-13
(3) D:ivered:lend surface Lift.
(4) O4aiser with TG 7.3 at E/kind
JORL 1.3 requirgments within t: everel?. J-3 effori..
ae
”
on pee ft
DOD represe.iative
9004 bs
eet Seer Nina
of the evacuation check -.ist.
om gm 0
.
Resne sible ties
Bikind-cniwetok airlift
Sikin:. heliesopter litt
Coordi:ation and supervision o
TU<j13 requirements within the
overall: J=-3 effort.