The L-3 Section UGRL will have representatives gtSoth atolis. The

Sack “geimary responsibility of the L-3 representatives on these atolls is to esure
that the recuirements of Task Units 12 and 14 ers met and that these recuirer nts

are integroted into the overe)] pins ani osecions effort of TG 7.1. ihile
the menbers are primarily interested in L-3 UCL requirements and support, it
has been agreed by J-3 LASL and L-3 ‘UCRL that 211 mexbers of botr sections wi. *
work a8 a team with the objecuvive cf ensu: lig t1a% Te3k Group 7.4 receives th..

plans and operations sunort necessary to accomnlish the mission.

5.

IAndividrvsel Beszonel:ilities and Iszaticns
(1) P. 2. Hoceer, J-3 TG 7.1 4s resnosible Jor the dircetion,

coordination aid sapervision cf the J=3 effort fsr O cration CASTLE

(2. Lb. S. Themason, 1-3 UCRL is respo: sible “or ensuriny that “he

UCRL recuirement:. are iutegrcted inte the overc:1 TG ’.1] effort.
will Se prirarilr st Ferry Island.

His 2 catic

BIRIN” ATOLL= 7) Rt. Tess

Name
(a)

ow. T. Lerwir.

(b) R. MN. lerley

(2)

<irection and coordination of .-e
J-3 efJors ai Eikini Atc J.

() Sffeat-12 surnort
(2)

Soord::ationof trailer sovemen

(c) o&. Scarlett (Asst, in3 UCRL)

(2)

Coordination and sapervision ¢:

(d)

¢, Lyor.

(3) Evacuation planning and prepar ion

(e)

G. Alexandex-

{f}

TU-13

(3) D:ivered:lend surface Lift.
(4) O4aiser with TG 7.3 at E/kind

JORL 1.3 requirgments within t: everel?. J-3 effori..

ae

”

on pee ft

DOD represe.iative

9004 bs

eet Seer Nina

of the evacuation check -.ist.

om gm 0

.

Resne sible ties

Bikind-cniwetok airlift

Sikin:. heliesopter litt
Coordi:ation and supervision o
TU<j13 requirements within the
overall: J=-3 effort.