(1) Provide one aircraft for outer line and one for inner line Dan buoy recovery to
(a) Report all buoy contacts to Rendova.

(b) Precede surface units on M+1 day into buoy areas to develop preliminary plot.

(c) Stand by to assist surface units in locating buoys.
4. The actual method of recovery will be at the discretion of the commanding officer concerned. In recovery of the buoy it is important that it be brought aboard essentially in a vertical position so that any liquid which has been collected in the polyethylene bottle will not be
spilled. Care should also be taken to prevent extraneous material from comingin contact with

the gummed-paper surfaces. Once the buoy is aboard, representatives from Project 5.4a will
monitor the buoy and remove the samples.
5. All task element commanders and task unit commanders operating individually will
report all contacts positively identified as Dan buoys to CTG 132.3, giving letter designation of

signal flag on mast to Dan buoy(if it is visible), time of contact, and position. Prior to H-hour,
patrolling units will report all contacts made on scheduled patrols but will not deviate from
scheduled patrols to investigate, search out, and positively identify contacts in vicinity of
planned buoy positions which appear to be Dan buoys. After M-dayall patrolling units will
identify possible Dan buoy contacts and report positive contacts to CTG 132.3, giving letter
designation of signal flag on mast of Dan buoy(if it is visible), time of contact, and position.
These position reports will be used to coordinate the direction and movement of recovery
vessels.
6. Return buoys recovered to project officer on Elmer.
7. a. Commanding officers of launching and recovery vessels will report to CTG 132.3 at
6-hr intervals, using AFSAL 5104 to give

(1) The letter designation, time, and position of launching of Dan buoys.

(2) The letter designation, time, and position for Dan buoys when recovered.

b. Channel assigned: 532 kc CW and 2150 ke (voice).
c. Voice calls: O’ Bannon.
Hickup Three
Yuma

Envious Four

Rendova

Excellent Zero

Arikara

Envious Three

P2V Aircraft

(NR)

d. Terminate recovery operations when directed.

Cape Cod

8. Collection of Fall-out by Ships
a. Supporting Task Units:

1.
2.
3.
4.

TU
TU
TU
TU

132.30.0
132.31.0
132.31.4
132.31.0

5. TU 132.32.2

6. TU 132.33.0
7. TU 132.33.1

8. TU 132.33.2
9. TU 132.33.3

USS
USS
USS
USS

Curtiss
Estes
Leo
Oak Hill

USS Agawam

USS Carpenter

USS Fletcher

USS Radford
USS O’ Bannon

10. TU 132.3.0
USS Rendova
b. Description: This portion of Project 5.4a is concerned with the installation of stickysurface 1-ft-square plates aboard the ships listed above. The plates have been delivered by

LCDR Heidt. They are to be installed and changed by ships’ forces. Detailed instructions for

installation and changing are secured to the lid of the box containing the sample plates. Plates
will be returned to the project officer.
ce. Support Category: Install and change plates in accordance with instructions received
from Project 5.4a on a “not to interfere with primary mission”basis.