44 « The Containment of Underground Nuclear Explosions

Figure 3-7—Vessel | Closures

Mechanical closures

(MAC/GSAC)

~*~ Mechanical closure
(TAPS)

Pre-fire geometry

Approximate closed FAC geometry

Fast acting closure

(FAC)

A) Mechanical Closures (MAC/GSAC)

B) Tunnel and Pipe Seal (TAPS)
C) Fast Acting Closure (FAC)

SOURCE: Modified from Defense Nuclear Agency

the pipe ahead of the shock wave to prevent
early flow of high-velocity gas and debris into
the experiment chamber.

enoughto squeeze the pipe shut. The stemming
plug stops forming at about the distance where
the first mechanical pipe closure is located.

e After 0.05 seconds(c), the ground shock moves

e After 0.2 seconds (d), the cavity growth is

past the second closure andis no longer strong

complete. The rebound from the explosion

Select target paragraph3