——"

me

OTT

mere

ae ama

:

°

i

.

J

.

a

,

geo

~

as

)

0

ou

ght reports on radiation will be mde in
conjunction with the standard weather reporting
.

r

.

‘

.

-

:

,

;

,

messages used.for weather reconnaissance flights.
Special reports are to be transmitted for any .
positions where radiation intensity reaches a
maximum along a segment of the flight track, re-

gardless of whether or not such positions coincide
withpoints of regular 100-mile weather reports,

Additional special reports should be made at
critical positions in the flight track, such as
positions which define a cloud boundary, a turn
out point, or any other unusual situation.

.
:

:

(2) Heavy Particulate Sampling Sorties:
(a)

One (1)

= no

WB-29, call sign WILSON ONE, will take off .

at approximately H-5 hours. Exact take-off time will be specified -in Annex "C", "Mission Execution Sched-.

ule",

This aircraft willcontact ‘the Eniwetok 406 on

VHF Charinel "C" and ‘on HF Circuit J-410 immediately
after take-off, The AOC will vector WILSONONE out .
his designated corridor in Annex "D", “Aircraft H-Hour ©
Flight Plan," WILSON ONE will be instructed to contact _
the CIC on VHF Channel "F", The aircraft -will perform —
weather reconnaissance within a 30 mile radius of the °

ve

‘|

Eniwetok frea and report any’ significant weather to. —
the A0C or CIC .as directed. He will perform an "Upwind" weather run culminating in an H-hour position —

-

as required in Annex "D", "H-Hour Positions and SON”

Patterns", ‘At: approximate ly H 4 1:00 hours, WILSON ©
ONE ‘will bedirected by CASSIDY to conduct the Heavy .

2.8)

ss

Pe

<

$ ,

Particulate Sampling Operation, The time of this oper-

_

ation will be decided by the ‘Scientific Director in the -

-

*

'

Control B-36. WILSON ONE will also be:provided all

~

- significant rad/sefe forecasts, prior to the sampling
operation, by the CIC Controller, ‘Safeguarding of the |
aircraft and crew, however, will be the responsibility,

_ Of the Rad/Safe monitor aboard WILSON ONE. After the |.
sampling operation is completed, WILSON ONE will be ~
- vectored ‘back to his assigned corridor by the CIC Con

troller,

When 50 miles out from Eniwetok; WILSON ONE

will be instructed to call.thé Eniwetok AOC on VHF Chan.

nel "C" for control and further instructions, The Eni-

wetok AQC will vector “WILSON (ONE to:‘Eniwetok’ for danding.

(b) Briefings oan

-

1. ‘The WILSON ONE crew wild”be thoroughlybriered on

the radiation reporting procedures by the Scientific

F

-

.

.

8

Taak “Group Sampling Project Officer prior to each.

a

te ,

.-

OFFICIAL:

Pe,
.
i

conducted. by. Commenter Test Services.Unite i... 2
le

.

u

Bee pilee

tee

“HOWELL MiESTES, aR”.

_ prigedier, General, Ud. 8. a. ry

” PAUL H, -FACKLER hb Colonel, USAF . Directorof Operations:
3 Ippendices: Ure me

noeots1, Clout:tackling Chart, PitA.

poeoe “2, Clow’ Tracking Charts, Fit #2.

be

‘Be Rad/Safe. Code - = 2"

‘TASK GROUP 7.4.”
“GPRS CRDER “NO,ai
ANNEXx Myf

‘

mission, ::The weather phase of the briefing will be

,

we

Select target paragraph3