:
Provide twelve (12) F-84 aircraft for necessary sampling
(2)
-
missions for B-Day. (See Annex H)
s and sam
i. (3), Provide four (4) B-36 aircraft for control, I,effect
K)
and
G,
s
Annexe
(See
pling missions for B-Day.
(4) Provide one (1) Be47 aircraft foi an effects mission on B-Day.
(See Annex J)
:
(5)Integrate the operations of three (3) 3-50 atreraft into
Lee
oe
.
. B-Day.
(See Annex 0)
(See |
°
(6) Assure adequate sample removal| procedures for B-Day.
_ Annex R) .
L
(7)
.
Augment the field maintenance, facklities of the Test Support a
.
Unit as required. —
£ personal |
. (8) Provide ‘for complete care, storage, ‘and issue of
Unit.
‘Aircraft
Test
the
of
crews
eir
all
to
t
° equipmen
-.
-(9). Prepare the marshelling plan for. all aircraft which will de=- part from ENIWETOK to Farticipate in B-Day, and special
missions.
>, (10)- Prepare a* post mission parking plan for all eiicraft venr .
..,
§hat will lend at Enivetok|after, the’*completione
‘of theda
. mission. | pore
lee
tes
“(n).Sprepare’ a mission”“Secution |chartand assure
e
5 that take-offs PS.
swoe_ and -dandings. are accomplishesas Specified 3in Annex Go 27
a8 ee
. be
“testServices
2Taste
3 ‘support to:‘the(3): ‘Provide’‘edequate’“Shaeand“other ‘Gequived SAR:
¢ B-Day
“AOC and CIC for operational control Emoughout ‘the
= mission; ©{See Annex FP).ot
bet
.
Be eet
-
oTProvideadequate WB-29°‘weather “Feconriadssanes,’‘eloua tracking oe
:
(See t=
m
‘and s ingservices throughoutthe B-Dey mission.
Annex. M
2
; ehths | cic and AOC ‘throughout the. bay mission.-
<
;
“theBday se
¢ tnroughost
(7) Assure adequatecoumindcations facilities
a Poe ee mission.
"tugment’,thefield‘naintenanee factists
‘Tait|Be.
orequireds'
TASK GROUP'7.4
- OPRS ORDER ' NO,’