f
.
gee
eo
a. 9
oo
x
f
(f) Insure that samples will not present a radiological
hazard on the return flight as a result of improper
packaging.
- of
.
.
.
-
4
(g) Assure the departure of four (4) R6D sample return
. aircraft from ENIWETOK ISLAND on the following
mo
schedules
=
.
1. - Two (2) aircraft as early as H/5 200, tobe
’
determined by progress of samplings
2. One (1) aircraft departs ENIWETOKapproximately H/36:00,
“Be
St
One (1) atroraft departs ENIWETOK approxi- —
mately H/72:00,
.
(3) The MATSwill arrange for the arrival of sample return”
-
aireraft at ENIWETOK on the following schedules
.
,
o
.
7
1
(a) Priority I trips will arrive at O600M on D-2 days
‘ and will be operated with heavy type transport
. equipment.
oy
so
?S
.'
'
-
‘
}
}
,
/
departure at ENIWETOK ISIAND with a back-up air-
craft at KWAJALEIN ISLAND at 1800M on D-Day and
will be operated with medium type transport
equipment,
—
re
_ (ce) Priority III tripwill be in position and ready for’
*
**
‘departure at ENIWETOK ISLAND at 0600 on D/3 days and = |
will -be operated with medium type transport equipment. ce
3. * PROCEDURES: “Specific detailed operating procedure
s for
the accom
plishment of the above will be prepared by theTest Unit
responsible,
;
-
.
HOWELL M. ESTES, JR,
Brigadier General, U.S. A. F,
7
ne
_ OFFICIALS 7
E
ne
(bo) Priority II trip will be in”position and ready for
:
.
y
q
,
oO
Co
Loy
SM
eo
,
.
eH PACK ER’?
7
Lt Colonel, USAF ~~
Director of Operations
—
.
ee
mo
‘
,
-
“ .
7.
“ ‘,
7
es
me,
Aono.
oat
eee a
a
inbeivieret ee
2
" z
SO
se
ce
J
“TASK GROUP 7.4" bY
8%a
OPRS ORDER NO. 5-54. ANNEX R=,
nema
;
z