DRAFT
22 Jan

90
ADMINISTRATION
RADIATION
RELOCATION

The DPreplies to the testimony by Sen. Anjain at the 28

meeting that medical/radiation records are already available t

100

ecember SPEERA
the Marshallese,

although general policy is that they do not release unevaluat¢d
data; that the
comprehensive and independent study of Rongelap Island would
authorized if the
independent study of the DOE’s data by Kohn concluded that the [DOEdata did not
support the habitability of the island; and that the organizational
assignment to DP
has no influence onits technical content or scientific results.~”
24 jan

90

ADMINISTRATION

PLUTONIUM

RADIATION

The Marshall Islands Nitijela (legislature) passes a resolution mmending DOE
Secretary Watkins for his support of a second look at Rongelapissu and urging him
to implement a phase 2 study of Rongelap Island.
In a draft response to the American Embassy in Majuro regarding cleanup of
Runit Island, DNA states that any attempt to start cleaning Rurgt now would be
premature. DNAisstill testing mining methods as a means for caning plutonium
from the soil, and the scope of cleanup required on Runit is more difficult and costly
than that being done on Johnston Atoll. If technology question§ are resolved at

Johnston Atoll, a Runit cleanup is two to four years away.

recommends

beginning long-range planning and coordination for Runit cleanup [and starting with

the planning meeting to identify a lead agency and assign critical

Jasks.™

2 Feb 90

CONTRACTOR
RADIATION

In response to the desire of the Marshallese to perform thir own radiation

measurements throughout the Marshall Islands, W. John Tipton, asgistant operations

managerfor aerial measurements operations of EG&G, recommendsfhattheislanders
purchase three or four hand-held survey meters for each atoll and fhat two or three
people on each atoll be trained in the operation of the instrumergs. He offers to
furnish limited use of EG&G’s germanium in situ system resourcés, provided that
EG&G takes the measurements if quantitative data on other atolls iq needed to tie in
with results of the 1978 survey.’"
16 Feb 90

ADMINISTRATION

CONTRACTOR
MEDICAL
The PASOissues the Operations Plan, Mission Number 90-4, FY 1990, for a

medical surveillance trip to be conducted by BNL at Ebeye, Majuro,
in March-April 1990."

Utirik, and Mejato

18 Mar - 13 Apr 90
CONTRACTOR
MEDICAL

During the spring medical mission to Ebeye, Majuro, Utirik, And Mejatto the

BNL team conducts 339 full medical examinations of the Marshallefe. The doctors

Select target paragraph3