reel were held down to a bare minimum, with maximum utilization being

placed-on hard-wire circuits. At Johnston Island this was extremely practical because of its size and the concentration of the scientific stations. A
special hard-wire circuit was established from the bunker (J-70) switchboard
to all manned stations for muster and coordination of the scientific effort.
This circuit proved to be an extremely valuable adjunct to the installed dial

system.

IntéPference with scientific instruments from all sources was a con-

tinuing problem throughout Hardtack.

Interference sources were determined

by means of ECM equipment, logic, visual and audible recognition, and the

“cut and try" method. The ECM solution, was of course, the most reliabie
in that, bearing could be determined and equipment identified by pulse analy-

zation, but was least effective either due to equipment malfunction or inherent equipment design limitations. As a rule normal ECM equipment sensitivity was far below that of the scientific receivers. The solution to this problem was to make the ECM center mobile and "sample" the interference with
a probe from the scientific receivers themselves. This approach was tried
during the Newsreel phase of the operation and proved tc be a valid concept.
For future operations involving large scale radio telemetry, the mobile
ECM concept should be continued, and the equipment should be of the latest
design that can be procured on a loan basis. Further, spare parts should
be available in advance to provide maximum flexibility. A source of independent power should also be provided on a mobile mount.
In order to transmit the count-down to all projects over long distances,

it was necessary to install medium high frequency single side-band equip-

ment for the Teak and Orange events. This communications system provided
a@ more rapid means of notifying the distant stations of delays or holds using
WWV time base.
The single-side band equipment was installed on Sand Island by Task
Group 7.5 and operated by Task Unit 5 in the 7 and 14 Mc bands. These
frequencies gave extremely good coverage throughout the Pacific, and unofficial reports from amateur operators in Honolulu indicate that the transmissions were received in Alaska, Australia, and throughout the U.S. Due
to the variety and types of receivers being used by projects to copy the
count-down it was found necessary to instigate a calibration count-down
starting at H-4 hr to enable the users to have their receivers properly
tuned. This requirement did not exist before with the VHF count-down equip-

ment as these receivers were crystal-controlled and no calibration or tuning
count-down was required.

3.14

SECURITY

As during previous operations, the security activities of Task Groups
7.1 and 7.5 were joint responsibilities. Within TG 7.1, coordination and
establishment of security policies was effected by the Classification Officer,
while personnel security functiony were delegated to the Military Executive,
J-1. Personnel security responsibilities were redelegated to cover the three
major groups of participants: Los Alamos (LASL, Sandia, EG&G, and 1st
RSSU), Livermore (UCRL), and Sandia Base (DWET).

Joint Task Force Seven SOP's 205-1 through 205-9, establishing the

security policies for Hardtack, were published between October 14 and No105