Conference Report

Re:

BIKINI CLEANUP

e

-

;

Page 2

__ Costs,2/23,
Estimating
Material Take-Off /

March 10, 1969

Addl

PFC
-

a

Requisitioning
Facility Maintenance

Equipment Maintenance

}

* These may be transferred from Bikini Costs to Other Costs.
Additional Costs for 100-Man Camp
Estimate was based on 61-man camp (36 H&N and 25

Bikinians) utilizing existing buildings on Enyu.

Labor _

_faterial ===——~—~—~S—t:—“CM Camp Supplies

Additional Spare Parts for Equipment
Equipment has been increased by JTF 8 to include the

following additional items: 1 LCU, 2 LCM's 1 Picket
Boat, 2 Tractors, 1 Crane, 3 Trucks, 3 Distillation

Units, 5 60-KW Generators, 1 Forklift, 3 Personnel

Vehicles.

Additional Daily Subsistence & Camp Costs
Due to increase in population from 61 (36 H&N and 25
Bikinians) to 90 (40 H&N, 30 Military, 20 Bikinians),

or - say 30 at $6/day = $180/day, say $200 day.
$200/day x 150 days (5 mos) =’|

~

Additional Fuel Costs

Due to increase in Item C above.

Original estimate in-

cluded 95,000 Mogas and 75,000 DFM totaling 170,000
gallons {/180 days, or approximately 1000 gal/day. Based

upon equipment now to be utilized, the revised figures are
55,000 Mogas and 295, 000 DFMtotaling 350,000 gallons

£/180 days, or approximately 2000 gal/day. Increase of
1000 gal/day at 20¢/gal = $200/day extended for 180 days
(6 mos) equals approximately §~~ ~~~

S0G5590