Conference Report
Re:
BIKINI CLEANUP
e
-
;
Page 2
__ Costs,2/23,
Estimating
Material Take-Off /
March 10, 1969
Addl
PFC
-
a
Requisitioning
Facility Maintenance
Equipment Maintenance
}
* These may be transferred from Bikini Costs to Other Costs.
Additional Costs for 100-Man Camp
Estimate was based on 61-man camp (36 H&N and 25
Bikinians) utilizing existing buildings on Enyu.
Labor _
_faterial ===——~—~—~S—t:—“CM Camp Supplies
Additional Spare Parts for Equipment
Equipment has been increased by JTF 8 to include the
following additional items: 1 LCU, 2 LCM's 1 Picket
Boat, 2 Tractors, 1 Crane, 3 Trucks, 3 Distillation
Units, 5 60-KW Generators, 1 Forklift, 3 Personnel
Vehicles.
Additional Daily Subsistence & Camp Costs
Due to increase in population from 61 (36 H&N and 25
Bikinians) to 90 (40 H&N, 30 Military, 20 Bikinians),
or - say 30 at $6/day = $180/day, say $200 day.
$200/day x 150 days (5 mos) =’|
~
Additional Fuel Costs
Due to increase in Item C above.
Original estimate in-
cluded 95,000 Mogas and 75,000 DFM totaling 170,000
gallons {/180 days, or approximately 1000 gal/day. Based
upon equipment now to be utilized, the revised figures are
55,000 Mogas and 295, 000 DFMtotaling 350,000 gallons
£/180 days, or approximately 2000 gal/day. Increase of
1000 gal/day at 20¢/gal = $200/day extended for 180 days
(6 mos) equals approximately §~~ ~~~
S0G5590
- CENTREr
ganennn
T.
\
)
{
aw