E ia APPENDIX A Joint Task Force 7 Cost Report - (FINAL REPORT) Curulative to June 30, 1954 - Reimbursable Work (Cont.) SCIENTIFIC CONSTRUCTION OPERATING COST Cost Code No. Function Labor Civilian Total Operating Costs Other Costs Matenials Labor Civilian Other Costs Materials Total . Construction Costs Total Expenditures ie MAINTENANCE SERVICES 7327 Rewind Shut Coil for LST 1126 7329 Repairs to Navy LCM 48 253 $ 43 $ 63 $ 120 $ 3 $ $ 120 435 98 148 148 1 585 839 339 1,186 87 2,700 3,973 3,973 508 191 1,333 2,032 2,032 Total 2,203 354 6214.” 1771 Total Other 3,224 533 7339 Drydock AJR 7353 Sandblast & Paint LCM 46 - 48 TOTAL REIMBURSABLE 50 $69,909 $12,678 659 $ 32 659 OO 6,971 10,728 147,704 «$145,245 $227,832 $257,685 Total Transfered to SFOO Untransfered Balance (Per Balance Sheet} - ~ a 110,307 837,088 += 795,049 $201,267 $896,531 $1,355,483 F kt FAT 805,777 ‘$1,583,315 $1,583,315 r °F Page A-17 Rot q 14 192 yh 4 $ 7324 Turnbuckle Dogs for LST 1126 r 4 MWO - 7323 Replace Armature - LST 1126 F a -_ vr be ae ]