E ia

APPENDIX A

Joint Task Force 7 Cost Report - (FINAL REPORT)
Curulative to June 30, 1954 - Reimbursable Work (Cont.)

SCIENTIFIC CONSTRUCTION

OPERATING COST
Cost
Code
No.

Function

Labor
Civilian

Total
Operating
Costs

Other
Costs

Matenials

Labor
Civilian

Other
Costs

Materials

Total
.
Construction
Costs

Total
Expenditures
ie

MAINTENANCE SERVICES

7327 Rewind Shut Coil for LST 1126
7329 Repairs to Navy LCM 48

253

$

43

$

63

$

120

$

3

$

$

120

435
98

148

148

1

585

839

339

1,186

87

2,700

3,973

3,973

508

191

1,333

2,032

2,032

Total

2,203

354

6214.”

1771

Total Other

3,224

533

7339 Drydock AJR
7353 Sandblast & Paint LCM 46 - 48

TOTAL REIMBURSABLE

50

$69,909

$12,678

659

$

32

659

OO

6,971

10,728

147,704

«$145,245

$227,832

$257,685

Total Transfered to SFOO
Untransfered Balance (Per Balance Sheet}

-

~

a

110,307 837,088 += 795,049
$201,267

$896,531

$1,355,483

F kt

FAT

805,777
‘$1,583,315
$1,583,315

r

°F

Page A-17

Rot

q

14
192

yh 4

$

7324 Turnbuckle Dogs for LST 1126

r 4

MWO - 7323 Replace Armature - LST 1126

F

a

-_

vr

be

ae

]

Select target paragraph3