CHAPTER IV, SECTIONS 7 and 8
The exchanges provided were as shown in the following table:
EXCHANGES
No. of
Positions

Type

Tare
Nan

Kellog
Kellog

1
1

100
60

20
20

100
26

Charlie

BD-9

1

60

40

24

Fox

Ursula
Elmer
Elmer
(Fred)

BD-9

Kellog
Kellog
Kellog

Lines

Equipped
Trunks

Site

1

60

1
3
1

60
280
50

The telephones at each site during peak

operations were as follows:
Common

Site

Battery

Tare
Nan
Fox
Charlie
Ursula
Elmer
Total

122
32
25
27
33
335
574

Magneto

Kellog
0
0
0
0
6
9
15

EES8

48
26
22
20
18
14
148

While most of the communications between

atolls requiring rapid transmission were handled

by either teletype or radio-phone, the volume
of official mail was considerable. Mail of a

40

20
40
15

Lines

22

27
277
0

In Use
Trunks
20
15

7
7

10
34
15

routine nature, such as confirming data, correspondence containing information and instruc-

tions in which time was not considered essential,
plans, drawings, and other documents, was
handled through this medium. The handling of
this mail was in accordance with AEC in-

structions and Security Regulations and was
accomplished through a classified mail messenger service. At the start of this service, mili-

tary couriers were used, but this service was

later performed by Contractor employees. The

mail pouch was manifested, the pouch sealed

and then placed in custody of the courier for

transit between atolls. At destination the pouch
was receipted for, and upon verification of the
contents, a copy of the manifest was signed and
returned to the originator.

SECTION 8
SALT WATER SYSTEMS AND SEWAGEDISPOSALS
Salt water requirements at all temporary

camps were met through the use of shallow
water wells. The camp needs of site Elmer were
met through the use of a well in Building 301,

while the CMRarea received its supply through

a lagoon intake. An entirely new well and pump- —
ing station was built at Fred to meet the re-

quirements of that site, but due to pumpdiffi-

culties this supply had to be augmented at

times by the lagoon intakes through the old
pumping station. Although some “sanding up”

of the wells was experienced, on the whole they
proved far more advantageous as a source

of salt water than the open lagoon intakes.
Marine growths and other foreign materials
were effectively screened through well operation. On the other hand the marine growths and
Page 4-52

foreign material, particularly paper trash from
vessels in the harbor, entering wells through a

lagoon intake excessively aggravated the operational work load of the CMR powerplant.

At all pumping stations, except the CMR
area, both motor driven and gas engine driven
pumps were provided to insure reliability of
the salt water supply. Tower tanks were installed which rode the distribution system, thereby
providing the necessary head. The pipe networks
were generally constructed of asbestos cement
pipe of various sizes. Except for a few breaks

in the piping system (the normal incidence of
accidental breakage), there were no particular

problems in the salt water distribution systems.