CHAPTER Ili, SECTION 4

arriving and departing employees
through this office for processing.

cleared

a manpower control chart was prepared in No-

personnel requisitions three months in advance

to allow sufficient time to recruit, process (including security clearance), and transport to
Jobsite the necessary additions or replacements.

In order to plan replacement needs, a form was

sent to each Jobsite employee three months

prior to his normal contract completion date,

which provided space for the employee to indi-

cate his desire to extend his contract, terminate
and return in 30 days, or terminate and not
return.

In April 1953, construction, engineering

and support services requirements necessitated

an intensive build-up in personnel, particularly
in the Construction-Maintenance Division. This
build-up continued until a peak population of
2,300 was attained on 7 December 1953, as

indicated in Figure 3-5.

The total peak population (H&N supported), including all sites and all groups, was
reached on 28 February 1954, with a total of
3,398. The breakdown of this figure, by groups,
is as follows:

October 1952
November 1952
December 1952

January 1953
February 1953

March 1953
April 1953
May 1953
June 1953
July 1953

1
1,010
244

11

Task Group 7.3

88

88

Task Group 7.5

19

JTF SEVEN

133
Total

3,398

With the majority of construction requirements met, return of personnel to point of hire

was begun in early January 1954, which result-

ed in the net population loss as indicated in
Figure 3-5. However, additional men werestill
needed in the Service Operations Division, and
when possible these positions were filled by
transferring employees who were then surplus

to the needs of other Divisions.

A cut-off date of 24 January 1954 was
established for receipt of ‘‘Q” clearance. All
employees who did not have a “Q” clearance
by that date were given completed contracts
and returnedto their point of hire. An exception
was made for 25 critically needed individuals
in this category who were allowed to remain on
site Fred and continue working until their “Q”
clearance processing was completed; this exception was granted by the Field Manager, EFO,
AEC. Most of the men returned to their points
of hire due to non-receipt of “Q” clearances
were employees of the Camp Department, and
this exodus resulted in a temporary shortage of
mess hall personnel at the time the Jobsite
was approaching its total peak population of
all Task Groups.
The following tabulation reflects the ratio
of voluntary terminations and discharges during
each month of the Operation:

Average Jobsite
Population

Insurance Representative
Task Group 7.1
Task Group 7.2
Task Group 7.4

decrease of 475 men from October to December
1952.

vember 1952 and projected over a three-months
period. All Divisions were requested to forecast

1,804

Holmes & Narver (TDY)

About the time that a camp wasestablished
at site Tare on Bikini Atoll, the Proving Ground
in general experienced an over-all curtailment
of activities occasioned by the completion of
Operation IVY, resulting in a Jobsite personnel

To plan personnel strength requirements,

Holmes & Narver (Permanent)

Voluntary

Terminations

Discharges

1,144
957
840

18
4
3

0
2
0

822
861
999

9
7
5

1
0
1

802
816

1,187
1,441

1
8

5
13

0
1

1
0

August 1953
September 1953
October 1953
November 1953
December 1953
January 1954

1,712
1,935
2,103
2,236
2,255
2,141

18
19
24
22
34
17

0
4
2
4
1
2

March 1954

1,511

5

3

February 1954

Page 3-14

1,937

7

0