Lf CHAPTER Il, SECTION 6 a omen ee wt ceiansanes ee Bo Figure 2-217. Causeway Location - Able to Delta first opened, until heavy construction started and traffic to and from the batch plant on Easy increased materially, single-lane roads were adequate. In August 1953 approval was obtained to widen these causeways to a minimum of 25 feet and to raise the elevation to plus 8.5 feet in order to minimize washouts at high tide. This latter work was accomplished on a fill-in basis, involving the least possible interference with the Scientific Program. ABLE - DELTA CAUSEWAY GENERAL.Shortly after site Charlie was selected for the Bravo experiment, a requirement developed for a camera bunker location 7500 feet distant from Station 20 at the end of the Figure 2-219. Page 2-218 Temporary Camp at Able