CHAPTER Il, SECTION 6

a omen ee
wt ceiansanes ee Bo

Figure 2-217.

Causeway Location - Able to Delta
first opened, until heavy construction started
and traffic to and from the batch plant on
Easy increased materially, single-lane roads were
adequate. In August 1953 approval was obtained
to widen these causeways to a minimum of 25
feet and to raise the elevation to plus 8.5 feet
in order to minimize washouts at high tide.
This latter work was accomplished on a fill-in
basis, involving the least possible interference
with the Scientific Program.
ABLE - DELTA CAUSEWAY
GENERAL.Shortly after site Charlie was selected for the Bravo experiment, a requirement
developed for a camera bunker location 7500
feet distant from Station 20 at the end of the

Figure 2-219.
Page 2-218

Temporary Camp at Able