PROPOSED DISTILLATION EQUIPMENT » FUTUR OPERATIONAL PERIODS
eee
SITE
SEVICTPATZD
POPUL:TION
FHiOPOSED
ELMER
2800
6 «DV 60E
2-5 600D
2-5 210 D
BYULPLENT
DAILY PRODUCTION
POTRITIAL - GAL
69,120 gal.
23,040 gal,
75,840 gal,
EZa-oooar
168,000 gale
FRED
4,000
1 = Set Flash
Evaporators 113,000 gal.
8 -DVC60E | 96,960 gal,
209,950 gal.
DAVID
30
YVONNE 00
URSUIA
GENE
300
200
l-S200D
2-8 600D
15 600 D
1S 200 D
{3,80 gal,
900
1S 600 D
LS 200 D
1 « 187,000 gal, concrete reservoir (existing )
1 - ol, COO gal, Redwood tank-tower (existing)
1- 300, 000 gal, concrete reservoir
(proposed new construction)
Ws0,000 gal,
“508,000 gal.
2 = 250,000 gal concrete reservoirs
(proposed new construction)
200,000 gel.
L = 21,000 gal redwood tower tank (existins)
52,000 gal,
1 = 500 bb1, steel ground storage tank
1S,COO gal.
23,010 gale
11,520 gal.
3 *B:0 gal,
1 = 5CO bbl, Steel ground storege tank
1 = 100 bbl, Steel Tower Service Tank
12 000 cal.
7,680 gal.
1 - 500 bbl, steel ground storage tank
b 000 fal,
15,360
gale
45,080 gal,
45 ;080 gal.
300
CONSUMPTION
1 = 100 bbl, steel tower service tank
25,200 gal,
23,040 gal.
,
FOX
PACTIZTIES
600 gal,
2S 200D
lh -§S 600D
RECOMG: DED STORAGE
2 = 4200 gal, steel tanks (existing)
7,660 gale
NAN
BSTIPATED
11,520 gal,
eae gal.
15,360 gal,
35,200
gale
|
1 - 100 bbl, steel tower service tank
25,200gale
.
1 = 1000 bbl. Steel ground storage tank(existipg)
2-500 bbl,
1 - 100 bbl,
88,200 gal,
1°
Steel Tower serviee tank
1 = 500 bbl, steel ground storage tank
1 = 100 bbl, steel tower service tank
222200 g
is
it
36,000 gal.
12,000 gal,