CHAPTER Il, SECTION 3
STATION:
PURPOSE:
SITE:
USER:

72.01
Telephone and Signal
Terminal
Janet
EG&G

PARTICIPATION: 4 and 23
CONSTRUCTION: 1-9-56/6-6-56

Existing GREENHOUSE Station 69 was
rehabilitated and known as Station 72.01 during
this Operation. This rehabilitation primarilly

consisted of electrical work. A safety switch was

relocated, and conduit and a new main panel

with 50-amp IP breakers were installed. Power

was supplied from two 5 KW gasoline engine

habilitated and identified as Stations 110 and
111 for REDWING. The replacement of fill,

metal

corrosion

preventive

measures,

and

power were required. Power was supplied by a
5 KW, 110 V, 60-cycle, single-phase generator
Timing signals and blue boxes were provided.
STATION:

112.01

PURPOSE:

Pressure Versus Time, on
Ground
Charlie

SITE:

USER:
DOD-1
PARTICIPATION: 18

This station was a self-recording gage in a

generators located outside of the station.

ground baffle and was used for measuring press-

STATIONS:
PURPOSE:

78.01 and 78.02
Release Tone System

ed and installed. The Contractor furnished and
set one survey reference stake at a location
within the target area of Station 18.

SITES:
USER:
PARTICIPATION:
CONSTRUCTION:

Elmer-Nan
TU-4, Sandia Corporation
18 and 19
4-4-56/4-7-56

PURPOSE:

Antennas

These stations were a pair of User-furnished

antennas. Antennas for 78.01, Elmer, were
mounted at the 50’ and 30’ level of Station
79.01 and antennas for Station 78.02 were

ure versus time. All equipment was User-furnish-

STATIONS:

113.01 thru 113.11

Pressure versus Time and

velocity versus Time at

SITES:

Charlie-Dog Reef, Dog,

Able and Man-Made

Islands.
DOD-1
18
2-27-56/4-23-56
4-21-56

mounted at the same levels on a pole located

USER:
PARTICIPATION
CONSTRUCTION:
OCCUPANCY:

cable was required.

These stations consisted of pipe columns
bolted to anchor bolts embedded in heavy con-

near Station 70, Nan. An RG 8/U cable extended from the antennas to Station 70, Nan, and
Station 71, Elmer. No power for the signal

STATIONS:
PURPOSE:
SITES:
USER:
PARTICIPATION:

79.01 and 79.02
Receiving Antennas
Elmer-Nan
TU-10 (LASL)
5, 6, 7, 10, 11, 13, 23, and
25
CONSTRUCTION: 4-4-56/4-7-56
These stations consisted of User-furnished

antennas. Station 79.01 was mounted at the top
of a 75-foot pole, and Station 79.02 was mounted
at the 125-foot level of the leg of the Station

70 tower. RG 8/U cable was run from the an-

tennas to Station 71, Elmer, and Station 70,

an.

STATIONS:
PURPOSE:

110 and 111
Diffraction Measurements

SITE:

Uncle

USER:
PARTICIPATION:
CONSTRUCTION:
OCCUPANCY:

(P.V.S.T. Gages)

DOD
22
3-7-56/5-5-56
3-28-56

CASTLE Stations 300 and 310 were rePage 2-60

Figure 2-44.

Station 113.06 - 45% Complete