CHAPTERIl, SECTION 3
thru .03 were located at Ruby and Stations
2141.04 thru .06 were on Pearl. A 60-pound,
8’-long rail pile was driven approximately 6’
deep into the reef at the point of recovery on
Ruby. The end of the recovery cable was secured to an existing rail pile which was driven
into the reef for the coaxial crossing used in
the Mohawk event.
STATION:
PURPOSE:
SITE:
USER:
PARTICIPATION:
CONSTRUCTION:
OCCUPANCY:

2200
Recording Station
Sugar
UCRL
22
10-28-55/3-12-56
3-12-56

wall for installation of two new 5” conduits,

cleaned ten existing 3” conduits and renewed
electrical wiring; erected a 16’ x 32’ type B-2
tent on a concrete slab adjacent to the station;
rehabilitated the existing salt water well and
supplied power for the utilities from a 100 KW
generator and for instruments from two 20 KW
generators located in Station 2210. One phone
was installed in the tent with an extension to a
trailer; five timing signal pair of cable were
terminated in a signal cabinet within the tunnel
of the station. Completion of this station was
delayed due to a shortage of certain electrical
items.

Criteria required the reuse of existing
CASTLE Station 2200. An engineering check
was made of the structure, which was designed
for 75 psi, to determine whether it would withstand the expected overpressures of 100 psi and
the required rehabilitation. No additional reinforcing was necessary. The work involved the
following major items: installed Cope trays in
Rooms A, B and C; installed User-furnished
@oaxial cable and dryers, and fabricated

Figure 2-98.

and installed a User-designed coaxial cable
manifold; installed dehumidification units in
Rooms B and C; drilled a 19” hole in the west

STATION:
PURPOSE:

SITE:
USER:
PARTICIPATION:
CONSTRUCTION:

2201
Recorder Station

Sally
UCRL
1, 2, 3 and 4
10-3-55/4-27-56

Existing CASTLE Station 2201 was rehabilitated and known by the same identification

Station 2201 - Utility Room
Page 2-109