CHAPTERIl, SECTION 3 thru .03 were located at Ruby and Stations 2141.04 thru .06 were on Pearl. A 60-pound, 8’-long rail pile was driven approximately 6’ deep into the reef at the point of recovery on Ruby. The end of the recovery cable was secured to an existing rail pile which was driven into the reef for the coaxial crossing used in the Mohawk event. STATION: PURPOSE: SITE: USER: PARTICIPATION: CONSTRUCTION: OCCUPANCY: 2200 Recording Station Sugar UCRL 22 10-28-55/3-12-56 3-12-56 wall for installation of two new 5” conduits, cleaned ten existing 3” conduits and renewed electrical wiring; erected a 16’ x 32’ type B-2 tent on a concrete slab adjacent to the station; rehabilitated the existing salt water well and supplied power for the utilities from a 100 KW generator and for instruments from two 20 KW generators located in Station 2210. One phone was installed in the tent with an extension to a trailer; five timing signal pair of cable were terminated in a signal cabinet within the tunnel of the station. Completion of this station was delayed due to a shortage of certain electrical items. Criteria required the reuse of existing CASTLE Station 2200. An engineering check was made of the structure, which was designed for 75 psi, to determine whether it would withstand the expected overpressures of 100 psi and the required rehabilitation. No additional reinforcing was necessary. The work involved the following major items: installed Cope trays in Rooms A, B and C; installed User-furnished @oaxial cable and dryers, and fabricated Figure 2-98. and installed a User-designed coaxial cable manifold; installed dehumidification units in Rooms B and C; drilled a 19” hole in the west STATION: PURPOSE: SITE: USER: PARTICIPATION: CONSTRUCTION: 2201 Recorder Station Sally UCRL 1, 2, 3 and 4 10-3-55/4-27-56 Existing CASTLE Station 2201 was rehabilitated and known by the same identification Station 2201 - Utility Room Page 2-109