CHAPTER I!, SECTION 3
to enter the station from detector Stations 1318
.02 and .03. Two new coaxial cable air dryers
were required. Power requirements were 15 KW,
120,208 volt, 3-phase. Five timing signals and
a go-no-go-circuit were to be provided. Rehabili-

tation started on 21 April 1956 and, at User
request, was stopped at 50% progress due to

the cancellation of the Pawnee event.

1318.02
Alpha Detector Station
Janet
DOD-13
5

USER:

1318.03

feet thick walls. A tunnel 24’ x 16’ x 15’ high ex-

tended from one end of the building to the cen-

ter of a 66’ long 3’-thick retaining wall. Approximately 10 of earth covered the tunnel and building. Because of the high loadings, the main rein-

forcing was placed in two layers throughout
most of the structure, and stirrups were install-

ed in the mannerof straight reinforcing in sev-

eral layers and parallel to the main reinforcing.
Within the building, two heavy lead doors re-

The tunnel entrance at the retaining wall contained a 3’-6” x 9-6” steel-framed blast door.

5

Station 1316, Yvonne, with exceptions as noted
below. The concrete bin was located on only
one side of the detector cubicles, and only three

each 3’x4’x3’-6” detector cubicles were re-

quired. Three 12”-pipes were to be used with a

clear line of sight to the working point of Station 5. The working point of the detector heads
were to be 20” above the cubicle floor. Progress
-

4-12-56

quired casters at the floor to support the weight.

Detector Station
Janet

This station was designed for use similar to

Me
anccol

1319
Alpha Recording Station
Charlie
LASL
18
12-12-55/5-5-56

Station 1319 was a reinforced concrete
building 26’ x 31’ x 15’ high with 51% to 6%

work was stopped on this station at the progress stage of 67% complete because of the cancellation of the Pawnee event.
PURPOSE:
SITE:

STATION:
SITE:
SITE:
USER:
PARTICIPATION:
CONSTRUCTION:
OCCUPANCY:

This station was to be a User-furnished
detector mounted on a portable wooden skid
and connected to Station 1317 with coaxial
cable. On 16 May 1956 and at User request,

STATION:

was stopped due to cancellation of the Pawnee
event.

Power was provided by two 30 KW, 120/

208 volt, 3-phase portable diesel engine-driven
generators mounted on a concrete slab approximately 45 feet from the station. One generator

provided power for normal needs; the other was

used as a stand-by unit. A 10 KW dummyload
was tied into an automatic transfer switch so
that the stand-by generator was loaded when
not used for station power. Each generator was
connected into a 36-circuit power panel through

wet
-~

monge.

“

~

vf

STATION:
PURPOSE:
SITE:
USER:
PARTICIPATION:

of this station reached 67 percent when work

aes

man ae

7

'

- f

=e

oo

e

ae

Figure 2-72.
Page 2-86

8

eaa Ek s
‘~

ae a

Se

x.

-

i tm,

2

oe
a

oo
pcr
natnag
.
+ Atanas
Tal
oa

Station 1319 - 72% Complete