08 battery room and a receptacle was provided for the battery charger. Receptacles for User-furnished equipment were installed along the main walls of the station. A 16-pair timing signal and telephone cab- inet were provided for six timing signals and two-pair telephone lines. The station was equip- ed with one portable dehumidifier and an exhaust fan. A total of 62 cubic yards of concrete was used. The average psi was 3,745 for 28 days. CHAPTER Ii, SECTION 3 STATION: PURPOSE: 191.01 Transducer Measurement and Wave Study SITE: Oboe USER: DOD-1 PARTICIPATION: All Bikini Events Except Station 18 CONSTRUCTION: 4-6-56/4-27-56 OCCUPANCY: 4-10-56 This station consisted of User-furnished equipment installed in existing CASTLE Station 102. A transducer cable was run from this station to a water depth of from 50 to 70’ in the lagoon. Emergency power consisted of a 3% KW gasoline engine generator and switch gear which were located on the station roof, except for the Zuni event when they were secured inside the shelter. STATIONS: PURPOSE: SITES: 192.01 and 193.01 Transducer Measurement and Wave Study William and How USER: DOD-1 PARTICIPATION: All Bikini Events Except Station 18 CONSTRUCTION: 3-20-56/5-4-56 OCCUPANCY: 4-18-56 These stations were User-furnished equipment located in Stations 560.05 and 75.02. A transducer cable was run from the station to Figure 2-50. Station 162.01 STATION: PURPOSE: a water depth of from 50 to 70 in the lagoon. Power from Stations 560.05 and 75.02 and a minus one minute timing signal were provided. 190.01 Transducer Measurement and Wave Study SITE: Nan USER: DOD-1 PARTICIPATION: All Bikini Events Except Station 18 CONSTRUCTION: 4-10-56/5-3-56 STATION: PURPOSE: This station was a wooden platform built at the 25’ level of an existing wooden tower nished equipment located in Barrack 107, was identical to CASTLE Station 165.01. Cable 4’x 6’ high steel cab was placed on this platform to house camera equipment. The camera equipment was designated as Station 911. Magnesium flares were mounted on five wooden poles located on the beach. Project-furnished and installed cable extended from the cab to a water depth of approximately 72 in the lagoon where it was attached to a buoy for marking the terminal point. A 3 KW gasoline on the reef. Normal power was supplied by the barracks system. PURPOSE: Signal was required. CONSTRUCTION: 5-1-56 /6-9-56 OCCUPANCY: 4-14-56 known as Station 1580.01 in CASTLE. A 3’x engine generator supplied 120 volt, single-phase, 60-cycle power. A minus one minute timing 194.01 Long Period Pressure Measurement SITE: Elmer USER: DOD-1 PARTICIPATION: Continuous Operation for All Events CONSTRUCTION: 4-11-56/8-10-56 This station, which consisted of User-fur- was run from the barrack to the low tide line STATION: SITE: 195.01 Continuous Pressure Measurement Elmer (Personnel Pier) USER: DOD-1 PARTICIPATION: Continuous Operation for All Events Page 2-65