battery room and a receptacle was provided for
the battery charger. Receptacles for User-furnished equipment were installed along the main

walls of the station.

A 16-pair timing signal and telephone cab-

inet were provided for six timing signals and
two-pair telephone lines. The station was equip-

ed with one portable dehumidifier and an exhaust fan.

A total of 62 cubic yards of concrete was
used. The average psi was 3,745 for 28 days.

CHAPTER Ii, SECTION 3
STATION:
PURPOSE:

191.01
Transducer Measurement
and Wave Study
SITE:
Oboe
USER:
DOD-1
PARTICIPATION: All Bikini Events
Except Station 18
CONSTRUCTION: 4-6-56/4-27-56
OCCUPANCY:
4-10-56
This station consisted of User-furnished
equipment installed in existing CASTLE Station 102. A transducer cable was run from this
station to a water depth of from 50 to 70’ in
the lagoon. Emergency power consisted of a
3% KW gasoline engine generator and switch
gear which were located on the station roof,
except for the Zuni event when they were secured inside the shelter.
STATIONS:
PURPOSE:
SITES:

192.01 and 193.01
Transducer Measurement

and Wave Study

William and How

USER:
DOD-1
PARTICIPATION: All Bikini Events

Except Station 18

CONSTRUCTION: 3-20-56/5-4-56
OCCUPANCY:
4-18-56

These stations were User-furnished equipment located in Stations 560.05 and 75.02. A
transducer cable was run from the station to

Figure 2-50.

Station 162.01

STATION:
PURPOSE:

a water depth of from 50 to 70 in the lagoon.
Power from Stations 560.05 and 75.02 and a
minus one minute timing signal were provided.

190.01
Transducer Measurement
and Wave Study
SITE:
Nan
USER:
DOD-1
PARTICIPATION: All Bikini Events
Except Station 18
CONSTRUCTION: 4-10-56/5-3-56

STATION:
PURPOSE:

This station was a wooden platform built
at the 25’ level of an existing wooden tower

nished equipment located in Barrack 107, was
identical to CASTLE Station 165.01. Cable

4’x 6’ high steel cab was placed on this platform to house camera equipment. The camera
equipment was designated as Station 911. Magnesium flares were mounted on five wooden
poles located on the beach. Project-furnished
and installed cable extended from the cab to
a water depth of approximately 72 in the
lagoon where it was attached to a buoy for
marking the terminal point. A 3 KW gasoline

on the reef. Normal power was supplied by the
barracks system.
PURPOSE:

Signal was required.

CONSTRUCTION: 5-1-56 /6-9-56

OCCUPANCY:

4-14-56

known as Station 1580.01 in CASTLE. A 3’x

engine generator supplied 120 volt, single-phase,
60-cycle power. A minus one minute timing

194.01
Long Period Pressure
Measurement
SITE:
Elmer
USER:
DOD-1
PARTICIPATION: Continuous Operation
for All Events

CONSTRUCTION:

4-11-56/8-10-56

This station, which consisted of User-fur-

was run from the barrack to the low tide line

STATION:

SITE:

195.01

Continuous Pressure
Measurement
Elmer (Personnel Pier)

USER:
DOD-1
PARTICIPATION: Continuous Operation for
All Events

Page 2-65