cables will be provided, if necessary, tamination will not be repented, 5.3 Typicol 53 ed Shot Simualetion of step-wise docon= Schedule Operations Prior to H-Hour Nons, 5.3.2 Overstions Betueon H ond R Hours (Sco Tab Bel3 for Schedule) 5302.1 training and bricfing. Organize decontamination crews, Complotc 5.3.2.2 Verify arranguments for instruments and 5.32.3 Check arrangements for transport of personnel survices vith 6.4d, 6.4f and 6.dg. from personnel decontamination center to test ship and return, 5.3.3 Oporations Aftcr R-Hour (See Tab B-13 for schedule) 5.3.3.1 <Assomble monitors and decontzminrtion teaus end trensport to tost ship aBLE in eccordsnco ~ith schedule, 5630322 Board ABLE and proceed with decontamination as planned, 5.3.3.3 “hen deconteminetion of ABLE has been completed, bring BAKER elongside and decontrminate in accordance with plan. 5.4 Botween-Shot Preparation (Sec Tab B-14 for schedule) 5.4.1 After decontamination operations have been completed, , all equipment will be monitored, decontaminated, checked and repoirod as NCCOSSEIY. ST, Louie ran 5.4.2 Upon receipt of the monitoring deta after the first shot, these will be analyzed to determine the edequacy end efficiency of the decontamination procedures, the individual methods and thcir manner of application, Any indicated changes and improvoments will be made wherever possible. Hot spots vill be located and reduced if they es S56