5.1

Pre-Shot Preparation (Seo Tab B-13 for detzils and schedule)
5.1.1

Hquipmont end Facilitics Check
All firchose and hot liquid ject decontemination

cquipment will be given fullecapacity tests eboerd Transit ABLE,
changes end modifications will be made if required,
Sele

Final

Off-Load Equipment

Deckestovied and othur equipment will be off-losdcd .
mnd pl:ced ashore in storago area,
5.1.3

Pointing of Ships

Sclected areas of both test ships 7111 be coetod with
a special strippable paint prior to the first shot, Assuming satisfactory performance will be obtained with this material, thc same or
lerger arcas of both ships will be protocted with this matcrial prior

to subsequent shots,

5.2

Dry Runs end Shot Rohesrsals (Scu Tab B-13)
5.2.1

Boardine of Shin

The borrding of Transit ABLES will be rchearsed by
sclected pcrsonncl from Toams B end C and, “hen available, from Tcam
L,. The sterting of the washdown system pumps will be accomplished
end the lighting off of one boiler will be simulated,
5.2.2

Decontaminstion

Aftor the boarding of Transit ABLE, the monitors will

practice their initiel monitoring while the scteup crews move the do~

conteamin>tion equipment into position, connect firehoses and steam
lines ond otherwise prepare for the scheduled decontaminetion procedures
which till then be simulated step-by-step, This will include intcr=mediate monitoring,

,

5.2.3 Positioning
4BLE,

of Tronsit BAKER

ST, LGU Ee

The ATF will bring Transit BAKER cslongside of Transit

Camels will be placed betwoen the vesscls if the tater is rough,

Decontamination equipment will be transferred from ABLE to BAKER, Fire=
hose and stoam lines will be strung from ABLE to BAKER, Supporting

ee

S's