5e5e5 Transvortation Four personnel boats and two motor whale boats are avail~ able and will be standing by with coxwains and engineers for transporting 6.4 personnel to and from the beach and Able and Baker. Schedules and numbers available will be arranged locally. 5.5.4 Operations MOLALA will initially moor alongside Able and the radiological survey will commence immediately after power is supplied and RadSafe is set upe This will be described in plan in Annex 6.4d. Atthe completion of this survey, the aircraft (Annex 6.4¢) will be removed, followed by the panels (Annex 6.4j). These will be hoisted by the ship's boom and lowered onto a barge to be supplied by the Task Force. These items will be towed ashore and transported to their respective testing areas. Simultaneous with the initial survey, the records fromthe gamma recording instruments will be retrieved by 6.4f personnel (Annex 6.4f). Successive problems leaders will then initiate their work, governed by the radiological situation and the planning conferences. For details of the operations of various problems, see Annexes 4, B, C, D,!, F, G,,H, I and Je As soon as the radiation level on Baker is sufficiently low to permit comiencement of operations on her, she will be moved alongside Able, and Able «rill commence supplying facilities to Baker. At this time, if it is radiologically feasible, the RadSefe and Technical Control Points will be moved onto Able. 5.565 Prevaration for Next Shot 5.56501 Operational Decontamination Depending upon the initial levels experienced on the ships, and the effectiveness of the washdown and the tactical de- contamination operations conducted by Problem 6.4b, an additional thorough operational decontamination may become necessary. Plans shall be made to determine the need for this sufficiently before four days prior to shot time that it may be completed by H minus four days. 5.52502 Readying for Sea ST. LOVis FRO At least four days before shot time all problem personnel shall devote their efforts toward getting their particubr arrange cents aboard Able and Baker for the next shot completed. The air- plane and panels in Annexes C and J shall be loaded, all instruments shall be checked for operational readiness and all other arrangemerts s nall be checked and completed in order that the Deputy Project Officer can report to the Froject Officer at least 12 hours before sailing time that the ship is, for experimental purposes, ready for sea. 009521 (ie 24 3/