As soon as operations oan be conducted for longer than 4 hours or the time between meals, personnel expecting to eat aboard either MOLALA or Able will bring a box lunch with them and leave it in a clean area designated by RadSafe. They will be monitored before eating, and be issued instructions by RadSafe in the proper care totake to avoid in- ternal contamination. At the end of each working day, ReadSafe will take such measures as necessary to decontaminate or otherwise control the radiological situation on MOLALA. 5.5.2 Technical Control 5 e5e2el Technical Control Point As soon as operations on Able start, a Technical Control Point will be set up on MOLALA. Here the various problem leaders or their representatives and representatives of the Project Officer will be located during working hours. Into this point, information will flow during working hours by means of having all personnel who do any work aboard Able and report their progress or findings to the problem leaders before leaving MOLALA for the beach. This information will be immediately available to all problem leaders and the Project Officer, thereby keeping each responsible person current with the day's progress. 5e5e2e2 Evening Planning Conference Each evenin:,, the Project Officer will hold a conference on Parry, in Bldg » for the purpose of planning the next day's operations and discussing the current day's progress and events. Present at these meetings will be the problem leaders, the Project Officer's staff, and other interested parties. It is at this meeting that regular decisions to follow or to depart fromthe basic plan will be made, and where news of Task Force decisions and plans will be announced, Although prior to each operation there will be a definitive and detailed operations plan regarding objectives, effort, and manpower and material requirements, it is planned that at the evening planning conference these plans will be changed as necessary in order that every bit of informtion available is obtained, governed by the probabilities of participation in or availability of information from subsequent shots. 5.52.63 Emergency Plan Chances ST. LOUIS FRC Each problem will proceed as plarined in the previous evening's planning conference, if at all possible. If it is not possible to follow the arranzed plan, or if an immediate change appears to be desirable, the problem leader will consult with other problem leaders and the Project Officer at the Technical Control Point. Clearance will be granted by the Project Officer or Deputy Project Officer if the change is considered desirable and feasible. 009521 Gees SO