4e703 Onesitc military manpower

Crews of cnlistcd personnel will b supplicd by Project
6.4 for movement of pancls and racks. Thces. dutics rcquirc 1 man-month
cffort with about 4 cnlistcd personnel. Tim: pcriods during which crews

arc nccded arc given in Tab J-6.

4e7e4 Post-Tc st Manpower
Analysis of data and writing of final r-port will rcquire
3 man-months cffort with 2 investigators.

4.8 Shipping and Transportation

4.8.1 Shipmont to sito
All cquipment and suprlics will b. loaded aboard Transit Ablc
by 31 Decomber 1953. Equipment and sunplics will b. unloaded at Enirctok
by 31 Jamary 1954.
408.2 Schedule of Personncl to and from Sit’.

Soc Teb d-7.

4.8.3 air shipm-nt of supplics or samples.
Nonc
Roll-up shipment

49

5, COMaND aXD COMUNICATION MATTLRS (TLST OPERATIONS)
Gon ral opcrational mattrrs arc as given in th basic plein.
shot tim. R-hour is r.-boarding timc,

H-hour is

5.1 Pri-Shot Prcparation Schedule (Tim: Schcdulc in Tab J~9)
5.1.1 On-site cquipment checks will consist of calibration of radiac
instruments, sctting up ofdeontamination cquipment ashore and ch cking its
op retion, and insp:cting of pancls and racks.
van
ae
Si, bhoUis fRC
5.1.2 Dry runs of operations will be nccded to assure that t.chnicucs
er. sufficicntly dcvclop:d to p-rmit sucecssful oporction when th. actual
contaminating ‘vent occurs. “hen th. cquipment is s.t up and checked,

personnel witl run through th. various docontamination t: chniqucs with the
pan ls in placc and also make dummy measuroments. It will also be important
to practicc transfrrring thc pancl racks from th” ship to th: shorc dcocontumination centcr to assurs smooth op:rution. If initiul dry runs for transfer show thet pancls ar: subject to exe: ssive vibration and shock, modifica-

tions of proccdure may b. nocded to prevent loss of contaminant from puncls

during th.

transf r aftr th event.

/37