4-4

Eguiprint K.quircncnts

Vapor & llcrs Cleaning unit (aveailebls ct CRL)

To (2) Engin cr rater pumps (availebl- ct CRL)

4.5

Four (4) scts of Pan ls (By BuShips)
Tyo (2) sots of pen-.l handling cquipmont
Two (2) shipboard mounting racks (by BuShips)
Instrument Roequiroments

Tro (2) NRDL bete dotcctors
Four (4) AN-PDR/TIB gemma detcetors
4.6

Supporting Scrvie_s Requircd
4.6.1

Laboratory Facilitics

Decontamination sitc on Perry Island - 1/2 aere
Scc Tab J=5 for sitc location

406.2

Shop Facilitics
Scrviee for beta and gemma instruments (Proj. 6.4)

Naintcnenec tcnt and fram> (Task Group 7.1)
£2643

Weter ,

Por. Ts

ote.

5,000 gellons of fresh wat.r por shot

4.6.4

Bill-ts, offiecs, storage
Office spacc in Project 6.4 arva for 6 mun.

Storag: speer in 6.4 arce for pancls ond cssocicted

cquipm nt.

4.7

(Section 4.4)

Quarters on each ATF during pre-test and test operations.
Manpov.r Recuiremcnts

4.7.1

Pre-test stetcside

Planning the. op: ration will rcquirs 12 man-months «ffort
with usc of 2 invcstigators.,
4.402 On-site technical manpower

ST. LOUIS #aC

cehnical inv stigetors rill deconteminetc poncls, make
m 2surchents, <nd supervise movement of pcnols, Thse duties will
r.ouir~ 12 men-nonths :ffort vith 4 inv. stigetors. Phasing of dutics

is given in Teb +6.

/3Y