4.10 Costs See Tab I-10 5. CO:LiAND AND COLRTUNICATICNS MATTERS (Test Operations) See Basic Plan. 5el Pre-Shot Preparation See Teb I-11 for details and schedule. Instruments aboard Able and Baker will be given a final calibration and operational test at test site. 5.2 Dry Runs and Shot Rehearsals See Tab I-12 for details and schedule. 50d Typical Shot Schedule 5.3.1 See Tab I-12 Operations Prior to H-Hour Final check of instruments; turn switches one 5.3.2 Operations Between HW and R Hour None _ 5.3.3 50% Operations After R~Hour 5305.1 Recovery of Data 5-3.3,2 Preliminary processing of data. 5.3.3.3 Dissemination of preliminary data. Between Shot Preparation See Tab I-11. Instruments to be given operational tests, "reloaded" with filter and graph paper, and recalibrated. 50d Roll-Up Schedule See basic plan and Tab I-15 for schedule, 5e5el Packing ST. LOu:S FRC When all decontanination is completed, equipment and tools will be made ready for shipment.