4.3

Post-Test Work on Transit Able and Baker

See rollup.
4.4

Post-Test Work at USNRDL
4.4.1

Post-Test Experimental Work

Instrument design will be reviewed, and further tests will
be made if needed to improve and complete the final instrument model.
4.4.2

Data Reduction

Preliminary airborne beta concentration information will

be divulged at test site.
4.4.3

tabs.

Completed reduction will take place at USNRDL.

Report Writing
This annex will be kept current by means of supplementary

Preliminary report will be written in the field.

to be written on return to USINRDL.

4.5

Final report is

Equipment Requirements

Consists of spare and replacement parts and tools necessary to
maintain and repair instruments aboard Able and Baker.
4.6

Instrument Requirements

A shipboard air monitor, Esterline-Angus recorder and a Solavolt
voltage regulator will be located aboard each ship.
4.7

Supporting Services Required at Site
See Tab I-7

4.8

4.7.1

Office and storage space.

4.7.2

Shop facilities end work area.

4.7.3

Ifisc. services (utilities, transportation, etc.)

Manpower Requirements

See Tab I-8
4.9

ST. LOUIS rn

Shipping and Transportation Requirements

Sea and air shipment requirements for materials and persomnel to
and from test area are shovm in tab I-9.

/3/

Select target paragraph3