5.5.2 Final Radiological Survey of Test Ships. See 4.3 525.3 Records and Classified Material. All records and classified material will be cleared through the appropriate channels and prepared for transmittal to USNEDL. 5.504 Radiological Safety Monitoring Support for Packing and Shipping Operation. In accordance with established radiological safety regulations, all contaminated equipment and material should be checked by Proj. 6.4g personel and marked accordingly. Where appropriate, contaminated equipment should be decontaminated in order to minimize unpacking, handling, and stowage problems. All contaminated equipment and material should be properly marked and tagged as to the type and anount of contamination and/or radiation levels. All radioactive test samples should be monitored and tagged prior to shipment. (See Tab G=16), 5.6 Communication and Timing Links. As in basic plan. covered by Annex L. 5°7 No special requirements for this group not ST, LOUIS FRC Report Scheduling. The final report should be completed three months after personnel return to USNRDL. 122 ay /AO