5.5.2

Final Radiological Survey of Test Ships.

See 4.3
525.3

Records and Classified Material.

All records and classified material will be cleared
through the appropriate channels and prepared for transmittal to USNEDL.

5.504 Radiological Safety Monitoring Support for Packing and

Shipping Operation.

In accordance with established radiological safety
regulations, all contaminated equipment and material should be checked

by Proj. 6.4g personel and marked accordingly.

Where appropriate,

contaminated equipment should be decontaminated in order to minimize

unpacking, handling, and stowage problems. All contaminated equipment
and material should be properly marked and tagged as to the type and

anount of contamination and/or radiation levels.

All radioactive test

samples should be monitored and tagged prior to shipment.

(See Tab G=16),

5.6 Communication and Timing Links.
As in basic plan.
covered by Annex L.

5°7

No special requirements for this group not

ST, LOUIS FRC

Report Scheduling.

The final report should be completed three months after personnel
return to USNRDL.

122

ay

/AO

Select target paragraph3