ey
the ships, «all personnel boerding or leeving the ship will be checked
by Project 6.4g personnel. FPersonnei plenning to bonri the ship rill be
checkee for adequate protective clothinz, dosimetry devices anc validity
of work area assignment. Pursonncel leaving the shi, rill be checked for
contaninetion. Preliminary decontamination, such as renovel of certain
erticles of contamineted clothing, may be requirec nrior to release of

perscnnel for processing throuzh the personnel deconterination facility on

Elmcr.

Detsiled procedures of these operations are outlined in Tab G-5,

as the test opcretion prograsscs and the shle Ship

is used as a work station for the Beker shir, the secomlary control station

will be moved from the tug tc the sable Shir. «area delincations will be made
ts control the flow of trceffic an? a responsible representative of Project
6.4g¢ will be availcble at all times to hendle ony emergency Rad Safe situation that might occur during the decontamination oporstions on board the
shirs. Specific operctional nlans will be made the night before each vorkday to enable Project 6.4g¢ personnel to provide edequatc coverage for the
scheduled test operetions on board the shins. Snccific attention sheuld be
raid to errengoments for removing any instruments, equirment or semples

fron the test ships in orccr to facilitate contemination control.

Proner

errenzencents for messinz will also have to be made in accordance rith the

Caily operation plan,
5.4

Betveoen Shot Prenaration

&t the conclusion cf Project 6,4 operstioh, all reciclogiccl

sefety cquirmcnt and instruzcnts rill be checked anc rercired cs necessery.

The personnel decontaminction facility will be carefully checked for nossible
unknown contarination and reatiec for the next phase of the test opcration.
Stocks will be renlenishcd an] nodificetion to procedurcs will be made in
accornance with the experience gained during the provisrus operation. Radio-

logicel survey techniques and cosimetry operations will be reviewed and
Louified as ceemed arviscble,.
5.5

Roll-Up Schcdule (Sco basic vlan and Tab G-15 for schedule).
5.5
5.1

Packing
ing

oo
ST, LOUIS FRC

When cll test operations ere completed, the equin-

ment an? instruments will be cleaned an2 repaired as necessary end packed for
stowage or shipment.

12

/19

Select target paragraph3