early February 1948, all these ships were docked at Te-al

Island

preparatoryto departure in convoy to Eniwetok.
The final requirementsfor the land-line telephone system were
laicidown at a conferenceheld at the Naval Research Laboratory on
16 December 1947. These requirementswere plotted on maps of the
planned island installationsand included:
a. Eniwetok (no map)
(1) Radio Chemistry;
(2) Security;
(3) Others.
b.

Parqy (no map)
(1)

Control Station (3);

(2) TelemeteringTower (LAJ-8 installation);
(3) Beach;
(L) Cable Teminal;
(5) CommunicationsBuilding fid Guafi.
c. Each Zero Island
(u Top of Tower (2);
(2) Tower Base;
(3) Timing Station (4);
(4) 400 ft. Station;
(5) 1000 ft. Station;
(6) k

llA?I;

(7) Gamna ?lBrt;
(8)
.

@nnIS”Cn (Runit dy);

(9) Beach;
39

Section XI

Select target paragraph3