early February 1948, all these ships were docked at Te-al Island preparatoryto departure in convoy to Eniwetok. The final requirementsfor the land-line telephone system were laicidown at a conferenceheld at the Naval Research Laboratory on 16 December 1947. These requirementswere plotted on maps of the planned island installationsand included: a. Eniwetok (no map) (1) Radio Chemistry; (2) Security; (3) Others. b. Parqy (no map) (1) Control Station (3); (2) TelemeteringTower (LAJ-8 installation); (3) Beach; (L) Cable Teminal; (5) CommunicationsBuilding fid Guafi. c. Each Zero Island (u Top of Tower (2); (2) Tower Base; (3) Timing Station (4); (4) 400 ft. Station; (5) 1000 ft. Station; (6) k llA?I; (7) Gamna ?lBrt; (8) . @nnIS”Cn (Runit dy); (9) Beach; 39 Section XI