over all concrete construction. A report of results obtained is
●

included h paragraph B of Section IV of this report.
So

much for the general outline of the construction mission and

organization. The latter is gra@icaUY

portrayed by the accoqanying

charts. There fol&x the detailed reports of the Resident &gineers,
which, when supplementedby exhibits contained in Section IV B of this
report, give the complete story of engineer Operations.
B. Reports of Resident Engineers.
lh~gebiIsland - Lt. Col. W. A. Stevens. Construction on Engebi.
●

Island started on 6 December 194’7tith the arrival there of the survey
party, the foundation crew of the blK-PKCompany, and 14 non-commissimed
officers and men from the 18th Engineer

ConstructionCompany. On this

date, excavation of the Zero Tower footings was started by the MI(-PK
Company, and the soldiers began clearing and initial grad’” for the
“ nmin control line between the Zero tower and the timing station sites.
‘ Until 24 December all constructionpersonnel, civilian and military,
lived aboard the LST 45 or the LST 219 which were alternately anchored
offshore to serve as a Wfloating hotel.m Pending the arrival of the
reminder of the 18th lhgineers from ~iwetok, the Iiesidentlhgineer,
JTF, directed the activities