Operational Report
Engineer Section
The Plaming and MobilizationPhase (3 Ott 47-30 Novlt71

This phee of engineer activities begins with the briefing of the
Task Force Er@neerby

the Jotit Ta$k Force Co-rider on 3 October 1947

and extends roughly to the 30th of November. Minor changes or additions
to plans were znde throughout the period of operation, tit essentially
all basic plaming and mobilizationwere completed by the end of Novewnber.
The engineer mission was to construct the Atomic l%ergy Proving
Ground on I!hiwetokAtoll

in

accordance with specificationsdetermined

by the Atomic Ehergy Commission, and to p!wride land-based housing and
utilities at the site of test operations as dete~d

by the Joint

Task Force Commander. Completion date was set at 15 *rch 1948.
Preparation of layout plans and detailed desi~s for test constructionwaa the responsibilityofA~

engineers, and, for participating

semices, of the respective Chiefs of Semlce.

Plans for construction

and rehabilitationof housing and utilities was ths reeponeibilityof
the Task Force E2@neer.

Procure-t

reaponsibjlityfor test construc-

tion materialswas divided by agreemsnt between the Task Force kgineer
and the using serwices. In general, all cammm constructionzaterials
were procured by the Task Force Engineer, using normal semdce channels
and facilities of the Western Ocean Division of the Cows of Engineers.