..
1
as the lead BWOaU and the Bureau Of yard6 and Dooke assisting,
it is suggested that the plan propooed in en~loam

(B) be exeouted.

4. There will be a ooneidemble amount of highly specialized
subimafinecable spliaing Perfo-d

●

the operation site. It la ro-

questod that the inetruotiotito the Bureau of Ships inolude this
oable SpliOi% requirement,the general i~tructiom

on fioh are set

out in enolomre (C).
6.

The oablo ship muet be nnde ●-ilable at the operation cite

on or before 1 January1948.
6.

Cable and otlnr material met

be a-ilable for loading at

%rt Hueneme on or before 20 llovekber1947. Marking and shipping
inetruotion,=y

be obtained from =4ndA

(Hr. W. C. Dudlay, Code

IM-121).
7. The cost of this pro~eet will be ohargeablo to funds 8ade
●vailable to the Havy Department by the Atomlo Energy Commission,

detailed”inotructiomeof whioh uan be obtained from the Fisoal
Mreetor of the Bureau of $uppliee and &oounts

(CaptainW. W. Honaker,

SC, USN Code DF).
t

FOR LT. GIHWRAL HULL:

00:

BusMpll 440
BuSandA

------

------

------

/a/ Garlen R. B-t
Garlen R. Br@nt,
Lt. Col., AGD,
Ad$rhnt GO= ml
----0------

----

EIELOBURH “AW
CABLE IAYI?IGCHAR
1.

It i. proposed to uee an LSH for la@ng the oable ●ssisted
18

-

Section XI
~

-

Select target paragraph3