- d. KwWAJALEIN: (1) - Project 6.6 requires a scientific site on this island, A ‘tentative site was picked by Nr. Zweigbaum in company with CDR Lowrie (Naval Station Air Operation Officer) in an area on the SW part of the island on the beach and near the Radio Receiving Station and Runway. be required. (2) No construction support will Project 34.4 also requires an installation on MWAJALEIN (See para 5b(2) above. By copy of this letter, CO, USNS, KWAéJA- LEIN is requested to confirm the availability of power, space and operational support required for this station, (CJIF SEVEN Ltr J-4/400.346 dated 6 November 1957, subject: "Project 34.4 Requirements" refers.) e, WAKE: Project 6.9 requires a cleared site 175' x 525' oriented so that the long dimension points toward KUSATE. A suitable area was selected by tr, Zweigbaum in company with tr, Musson, Island henager, one-half mile SE of KULU point on WILKES Island which has a causeway connecting with the main island. Instrumentation trailer (8' x 11'4" x 2214", Wr ~ 12 tons) and antenna masts will be located on WILKES Island. Confirmation of availability of this site is requested via formalized agreements with CAA. It is requested that CJIF SEVEN Ltr J-4/300.6 dated 15 October 1957 to ur. J. H, Beardslee be anended to reflect the above and to include a reguirement for approximately 100 sq. ft, of office space equipped with one desk, chair, safe, and file cabinet on WAKE Island. In addition, telephone commmications between the office and the scientific site on WILKSS Island and vehicle transportation are required. f. UTIRIK ~ Project 24.4 requires an installation on this island. (See para 5b(2) above.) 6. CONSTRUCTION ~ In addition to site clearing and H&N surveys required for Project 34.4 (both detailed in para 5 above), it appears that the temporary use of some manpower to assist in the erection of a Rhombic antenna 42 ft. in height on WILKsS Island will be required by Project 6.9. CJTF SEVN is requested to obtain this help. Construction for housing and messing the personnel indi- cated in para 2 above is also required. At the present time, there are no outstanding construction requirements for Projects6.4, 6.6 and 6.9 at CTG 7.1 level. 7. COMMUNICATIONS: a. TG 7.1 on ENIWETOK Atoll requires communication service and facilities (including a classified message capability) with all Task Group 7.1 scientific projects located at off-atol sites. 20 * f : Se See aS i pUeEtes PEP DOC REVIEW JAN. 15723 > v1 ZO

Select target paragraph3