ov astte | tobe be Zweigbaum of USASEL visited this island during September 1957 and obtained a contract for the site. It is understood that trust agreements were made and are all in order subject to AEC and HICOM approval. out the areas selected. (2) - TG 7.5 (R&N) has staked ° Native labor will be required to remove trees along the access route so that instrument trailera may be transported to the site locations, According to Trust Territory representatives, the total cost of labor and payment for trees should not exceed $1,000. It is requested that these requirements be made firm end authorization is requested to hire natives on a day to day basis with actual payment being made by the projects through Trust Territory representatives. b. WOTHO: (1) Project 6.4 requires a site 100' x 100’, relatively clear, with line of sight to BIKINI and ENIVWETOK Atolls. Mr. Zweigbaur of USASEL picked the ENEJU site as most favorable for his project. No agreement was obtained from the island” chief for “ne use of the site. Clearing of the site will be accomplished by the project personnel. (2) ° Project 24.4 requires a microbarograph installation on this island wrich will be established by personnel of TU-4. No speciel construction, other than for the surveys specified in the referenced letter below, will be required to establish this or other Project 34.4 sites. The physical location of each Project 34.4 installation is not critical but should be reasonably close to the supporting JTF SEVEN installations, TG 7.1 hes requested AEC-ALO to meke accurate surveys of this and other sites and to emplace monuments. The required monuments must be permanent to allow eccurate re-survey if this becomes necessary. (See TG 7.1 Ltr J6-646 dated 18 October 1957, subject: "Project 34.4 Requirements" and CJTF SEVEN Ltr J4/400.346, dated 6 November 1957, same subject.) ¢. RONGELAP: (1) Project 6.6 requires a site for an instrumentation trailer, semi-type U-51, with shop and office supplies. A site has. been picked close to the beach near the AWS/Rad-Safe station, which, it is understood, is agreeable with the Trust Territory Representatives. This site is in the open and no construction or tree clearance problems are involved. (2) Project 34.4 also requires an installation on RONGELAP (See para 5b(2) above.) _ 3. CLASSIFICATION C2..0 CL LE PER DOC REVIEW JAN. 1973

Select target paragraph3