ae
b.
KWAJALEIN
I
- Request CTG 7.3 provide vehicle support of Project
6.6 by authorizing the project's utilization of the existing Naval Station
Motor Pool.
c.
°
WOTHO, KUSAIE and RONGELAP
~- Authorize the projects at these
sites joint usage of vehicles provided to AwS/Rad-Safe installations.
type of vehicle must be Truck, 3/4 ton, w/A-Frame, winch and pintile.
10.
However,
POWER REQUIREMENTS:
a.
KUSAIE - Projects 6.4 and 6.9 will share a 30 kw diesel generator
b.
WOTHO - Project 6.4 will be furnished a 20 kw diesel generator
c.
RONGELAP - Project 6.6 will be furnished a 20 kw diesel generator
d.
KWAJALEIN:
which will be furnished by TU-3.
by TU-3.
by TU-3.
Project 34.4 will be supported by the AWS/Rad-Safe installation.
Project 34.4 will be supported by the AWS/Rad-Safe installation.
(1)
It is requested that CIG 7.3 arrange with CO, USNS,
KWAJALEIN to furnish Project 34.4 with 4 kw 120 volt
single phase power. (CJTF SEVEN Ltr J~4/400.346 of 6 Nov
1957, subject: "Project 34.4 Requirements" refers.)
(2)
Project 6.6 requires 15 kw 116 volt AC.
It is requested
that CJTF SEVEN determine if the tenant organization can
furnish this power and advise this Task Group as soon aa
practicable, TU-3 is prepared to furnish a 20 kw diesel
generator in the event this requirement cannot be met locally,
e.
UTIRIK - Project 34.4 will be supported by the AWS/Red-Safe
f.
WAKE ~ Project 6.9 will require 15 kw 115v AC.
installation,
It is request-
ed that CJTF SEVEN determine if this is available and advise TG 7.1 as scon
as practicable.
If not available, TU-3 will furnish a 20 kw diesel generator.
In this event, the POL requirements will be 90 barrels of diesel fuel and 2
barrels of gasoline rather than the 50 gallons of motor gasoline per observa-
tion day mentioned in para c of CJTF SEVEN Ltr J-4/300.6 dated 15 Oct 1957.
It should be noted that POL will not be supplied from EPG,
s
11.
POL REQUIREMENTS:
a.
KUSAIB - Projects 6.4 and 6.9 will require 180 barrels of diesel
fuel and 12 barrels of gasoline.
7.1 to TG 7.5 (H&N).
b.
WOTHO - Project 6.4 will require 90 barrels of diesel fuel and
2 barrels of gasoline.
TG 7.5 (B&N).
This requirement has been submitted by TG
This requirement has been submitted by TG 7.1 to
Setee
L
re eepeesi :
eet
ee
-6-
CLASSIFICATION We SEcLE3
PER DOC REVIEWJa, 1973
Z|
2
Ez,
“a