SItt) EERE| \ b. In addition, Projects 6.6 and 6.9 request authorization to use project tramsmitters and receivers for the purpose of interchanging technical information between RONGELAP, KWAJALEIN, ENIWETOK, WAKE and KUSAIE (See TG 7.1 CONF Ltr J3-H-290, dated 26 Sept 1957 to CJTF SEVEN, subject: "Classified Messages to Off-Atoll Sites" and TG 7.1 TWX, J3-H-424, dated 20 Nov 1957). c. By message DTG.172311Z of October 1957, CTG 7.1 has requested TG 7.5 that a field telephone line be installed between CJTF SEVEN Weather Stations at KUSAIE and RONGELAP to Projects 6.6 and 6.9 scientific sites located on those islands. ad. CJTY SEVEN is requested to arrange for the telephone communications e. CJIF SEVEN has requested KL-7 operator training for four (4) on WAKE and WILKES Islands for Project 6.9 as indicated in para 5e above. civilian personnel assigned to Project 6.9 at WAKE and will furnish two (2) each KL-7 cryptogrephic equipments. (See CJTF SEVEN CONF Ltr ser J-5/352 dated 16 Oct 1957 to CG, USAPAC.) TU-3 has been requested to furnish names and clearances of the operators who are to be trained, the designated custodian and the dates of their expected arrival at ASAPAC, (See CTG 7.1 CONF Ltr dated 23 Oct 1957, J3-H-354, subject: "Operator Training for KL-7".) Towever,. arrangements are now pending whereby the above personnel can be trained in CONUS prior to their departure to WAKE. 8. TRAININGs @, The CJTF SEVEN Ltr referred to in Note a to para 2 requested CTG 7.3 and CIG 7.4 to provide two (2) each microbarograph operators to mano each station during shot periods as additional duty. TG 7.1 CONF Ltr J3-H-312, dated 9 October 1957 to CTU-4, subject: "Operation of Microbaro- graph Stations for Operation HARDTACK”, discussed operator training and recommended that group training for all operators could be done at ENIVETOK during the latter part of February 1958. Subsequent information indicates that it may be more practical to conduct operator training at each site concurrent with its establishment. Accordingly, by copy of this letter, CTG 7.3 and CTG 7.4 are requested to nominate by name, rate and serial number the individual CTG 7.1. bo. 9, operators and forward es sc0on as is practicél to Training of KL-7 operators was discussed 7m paragraph 7e above. VEHICLES - One each truck, 3/4 ton, Weapons Carrier, with A-Frane, winch, and pintle is required at each off-atoll site manned by TG 7.1 personnel for the purpose of moving and erecting equipment and transportation of persornel. It appears that sharing the use of vehicles with other tenants at off-atoll sites is feasible since the requirement is not considered full time. a. WAKE - Request Ltr HQ JTF SEVEN, J-4/300.6 of 15 Oct 1957 to Mr. J. M, Beardslee be amended to include an additional requirement for vehicle support of Project 6.9. Ze fee Q Vehicle to be on a loan basis. CLASSIFICATION CANCELLED tne ene PEVIEW JAN. 1973 -5-

Select target paragraph3