PROGRAM 9

ELECTROMAGNETIC PHENOMENA

Equipment and techniques to be used in this program for Operation
Ivy have been tested during Tumbler-Snapper.

As practicable, the

results obtained are being used in instrumentation refinement.
Mr. Gordon C. Arnold, Jr. Has been assigned as Project Officer’ of

Project 9.4.
PROGRAM 16

TIMING AND YIRING

Edgerton, Germesnausen and Grier personnel plan to supervise the
installation of electronic equipment aboard the USS ESTES while the
sip is at Mare Island Shipyard during the early part of July.
Television gear and accessories were to be snipped to Mare Island on
1 July.

The Release Tone Project (Project 10.2) has been added to this
program.

Tnis project will be sponsored by the AEC and performed by

Sendia Corporation under the direction of Mr. C. B. McCampbell.

This

release tone will be used to furnish the starting signal to the EG&G
sequence timer on King Snot.

PROGRAM 11 SEISMIC AND GEOLOGICAL SURVEY
Project 11.1

Soundings of the Ocean Side of Eniwetok Reef

The hydrographic survey to determine the configuration of the
ocean side of the reef is now underway.

The team has been at the

Atoll for several weeks but the work has been delayed to some extent
by the failure of some shipments to arrive.

This includes recording

cameras, fathometer paper, and spare parts for the 42-ft sounding
boat.

Requests for replacements have been made, and it is expected

that the survey will be accomplished in the next few weeks.

40)

Select target paragraph3