2.

Ke

Condycted tpars will be held on D-2 day (March 15) and on shot Gay.

MECHANICAL EQUIPMENT
le

All mechanical equipment - cameras, both still, motion pictures and

television, recorders and transmitting equipment must be inspected to assure
compliance with security regulations and must be operated in conformance with
‘instructions to prevent interference with test transmitting equipment.
ae

Photographs will be permitted on the pre-shot tovr at the Control Point,

NewS Nob and in the forward area where CDA structures and shelters are located

and at Indian Springs and Camp Desert Rock under appropriate security controls.
Cn shot day photographs will be permitted at News Nob, and, if safety conditions permit, in the forward area after the shot to snow damage effects on
FCDA structures and shelters.

L.

COMMUNICATIONS
1.

A&C and FCDA are unable to furnish TWX circuits from the

to Las Vegas.

Proving Ground:

It is probable that the Signel Corps will furnish these facil-

ities as it did in April, 1952, at the request of the wire services and major
daily newspapers.
2.

Radio and TV networks will probably have to pay for land lines or

provide microwave voice circuits at their expense.

Select target paragraph3