Time Issue

Gi

Ic

FB,

Ie

fhbiogs

a vor

Noe

Time Out

Party

Dirt samples from near
Engebi personnel lani-

ing (to be done by

party #209)

Water sample collection
_ to north and west of
CVE along reef at about

11

2

2

2

and water survey

LAJ~3: (4 man) plus 2

2

CVE Filter Queen (check
and filter replacement)

2,

CVE evaporation check

1

SCHAPPACHER

AVe4, AV=5 and AGC~7
(Info, to CTG 7.6)

1

1

Drone plane clearance

On Station

Have Instruments

216

South Swimming survey

On Station

Has Instrumente

15

So, Perimeter survey .
(From Eniwetok)

On Station

Have Instruments

(Eniwetok & Parry)

CVE duty decontamina-.
tion Monitor
219

4, Men decontamination
of duck

Yelisopter

%

213

‘

1 IcI, -1 ou

in

te

men for DUKW plus 4 men |
boat crew (Ogle, Linnenberger)

Cr
D
F
I
S
S
A
L
Ui

10 MR/HR if possible

at?

UNCLASSIEFitp

211

Select target paragraph3