+h Reyne HG
| pa daetetan bom

=a:
YCKE TEST
Yoke test operations were carried out in the same manner ard on
the same approximate time schedule as for X-ray test.

Several Additional

missions were flo in connection with the operation and T.U, 7-6.1
personnel were pushed to the limit of physical endurance to maintain
their operations schedules,
Fall out occurred on Kwajalein on Yoke plus one and a radiological
control center was established.
collected for counting.

Surveys were made and vater samvles

The contamination was short Lived however and

by Yoke plus three had disappeared,
All. operations in connection with the Yoke test were canpleted by

Yoke plus nine and preparations were completed for the Zebra test very
shortly thereafter.

ZEBRA TEST
The expericnce gained on the first two tasts, plus the curtailment
of operations for the Zebra test, made this operation a canparatively

simple one.

The test went off without incident.

All possible data was

obtained,

|

POST ZEBRA DAY
Col, Isbell, departed for Hawaii on Zebra plus two to participate on
the Task Force Awards Board amd Lt.Col, Cody assumed command of the unit.
On Zebra pins one roll-up of the unit began.

for the ZI on exergency leave,

Three monitors departed

Final missions were completed and equip-

ment turned in.
-

wer?

Se:
az

2

2k

92 -

maniete

”
a
eer

:

mee

ae
s

eee Si romper iy tae_— ioe shel

Fou

Hag

Ke

oat

ene
LiesBee: ee

a

233 2x

ESS
ae ee
7.
Px<é

;

A

fA

oe

“es

PG,
tie
theais
te ea SaTA eefee
BU
ES

Ne eh es

eye

So

’

one TR
rhea

eee ts Eeehee

oa

CON

a re.Oa a \

aed

AE ces

ge Py

Select target paragraph3