‘
6
tbe.
ee
.
Sa
“
By Y..plus~6-day the work load dropped to normal level and the Yoke
post shot report was canpiled and submitted to CJTF~7 on Y-plus-l4-day.
Procedures used throughout the first two tests were continued for
Zebra,
On Z-plus-l-day a dispatch was received fron CJTF-7 concerning
entries on the Physical Records of all USN and UGIC personnel,
A
conference of medical officers and CTG 7.6 devised a report form which
would supply all Task Group Cammanders with the necessary exposure data,
It was planned to compile these reports before arrival in Pearl Harbor
a
.
ih he ¢
* 4 prt a]
pn
i.
SorbetAE TAPASat¥* SHSARE
on the return voyage upon campletion of operation at the test site.
~ 85
x
{Be sy