preres oo
Magy

bitin

Project 7,1-17/RS(CC)-8 - Test of Efficiency of Field Collective
Protector

\

The collective protector in an OCE structure was sheared from the

inlet pipe when the structure turned over and consequently failed to
collect a sample,

The only positive information obtained fran this

project is that the filters were undamared by the blast pressure at
this specific distance and that the equipment would probably have
operated satisfactorily,if the structure had remained upright.

The

other collective protector in the boat dowmvind sank prior to the test,
Its removal from the 1000 foot structure did not involve the loss of

F

any information since the blast would have prevented obtaining any data
concerning the 1000 foot structure.

‘Two new collective protectors were

obtained for installation in the ICM dovmrind in tests Yoke and Zebra,

Project 7o1-17/RS(CC)--9 «

Particle Size of Material in Cloud

Despite the fact that CCE structures were moved a considerable
distance the impactors operated properly and collected samples of dust
stirred up by the explosion.

No final correlation with particle size

has yet been mide since it is planned to study the slides with an
electron microscope at Edgewood, Md,

<A cascade inpactor will be

placed in an LOM located dowmvind about 2500 yards and also one ina

drone plane at 16,000 feet for test Yoke.
Project _7el17/RS-10

.

Thermal Radiation Papers

Only a few samples of Dr. Penny‘s paper on the plyboard squares
were not burned,

In test Yoke the papers will be placed at sreater

distances than at test X-Ray in order to obtain additional points,

~ 1] «

mo

Bae
petege SE seYE(EERE ERS
ee
fs
,

wet

fos

yi:RNRAGE,ARt He tot ee

at
Beer

Select target paragraph3