2

(ad)

NPE ACCITIL

U TD

On~

Tank control helicopter over personnel parties on ZERO
island seoms hazardous from standjoint of dust and

mechanical failure.

*

(e)

Farty leaders should not pre-eampt the duties of monitors.

(¢)

There should be a 6x6 truck available near revetment for

(g)

Gas msks were badly mishandled in the rehearsal.

(h)

Monitor in AVR~33 is on duty as a monitor and should not

(i)

It seems desirable to shield the land cable winch drum

($)
(k)

(1)

emergency use of disaster party on X-minus-1 morning.

They

should be kept in carriers when not actually in use,
have full-time duty as a radio operator,

to decrease radiological exposure of the operating
personnel,

Inadequate quartering and feeding facilities encountered

on Parry Island.

Adequate working personnel should be assigned to parties
where necessary to expedite missions.

lack of physical examination reports, eligibility lists

and control lists.

These items were taken up by CTG-7.6 with appropriate Task Group
Comanders following the next Task Force Conference,
On 7 April RADSAFE FIVE was published to all Task Croups, re~
questing that previously issued porcles for protection against blast
intensities be made Hight-tight before use by covering ventilation

holes in rubber housing.

(See Appendix "G"')

A supply section and issue point conbined with a decontamination
center was established on the port side of the BAIRCKO hansar deck.

report to this point and draw instruments, booties, «loves, and any

~

4

roe
tee
a
8 Meemepytc
Dt
aA,
42)
:
a
7
a
aR,

Biter:

”

It was planned that as monitors prepmred to leave the ship they would

.

au

“v

»

<

SPST

‘

»

woe ok
”~
~

a

bs

piste Ran
‘

e

%

pik

y

~ 55 -

yogis

seh,

~.

Select target paragraph3