SANTA
4FO.43 0
(3.50)
FS-271
F8-173
2
3/2375)
1/15/51
90-6071 1
eyed
:
JOB NO. 640 - ki, he
1
Aa
For:
CONTRACT NO.
sHeeT wo.
{jee
COMPLETION REPORT FOR
AS-BUILT DRAWING NUMBERS AND DATES:
F3~-1,62
ENERGY COMMISSION
FE OPERATIONS OFFICE
The Complete Construction of
or_20
“Not for use by A-E
DATE OF THIS REPORT:
LOCATION RUMIT ISLAND - SITE "Cc"
AT-( 29—1 1-507
2]
15 January 1951
Fresh and Salt Water Systeme, Elevated
23 March 1951
Water Tower, and Acid Tank Building
Bullding No.: 10h and 120, and Tank No. 112
ESTiMATE
fa,
Property
DESCRIPTION OF PROPERTY UNITS
Number
Quantit
’
Unit
Construction
Contract
Cost.
Est'd.
Value
Gov. Furnished
“Matertal °
Engineer
gineering
Cost
Total
“
SALT WATER SISTBI
The salt water syatem consista of 1070 lineal feet of |" transite pressure pipe
am 283 lineal feet of the 3" sise, undergroum, six service conmections, and
a reinforced concrete salt water well with cover, size 0.D. 1,'-6" x '-6" x 16'-
1" deep located 60 feet from the power house. 4 6" suction line from the well
to the pumps feed the distillation unite and the salt water lines.
1
Each
Direot
$6,676.32
Each
Direct
$6,676.32
Direct
$105,161.06
Indirect
35162420
$321.45
$10,162.97
$32h bb
$10,162.96
FRESH WATER SYSTEM AND TANK #112
The freeh water aystem consists of 360 lineal feet of |" transite pressure pipe
and 973 lineal feet of the 3” size, underground, and 5 service connections. A
fresh water steel storage tank #112, size 12'-6" diameter x 8'-6" (7500 gallons),
ie provided in addition to the elevated fresh water storage in tower #10,
1
Indirect
Distillation Zquipment - Installed in Bldg. 106
ELEVATED WATER TOWER -— Hidg.
Indireot
3,162.20
36,348.95
$141,510.01
#10
Wood sonstruction; set on six reinforced concrete piers and footings; wood
ladder.
TANKS - two steel, bolted, 4,200 gallon capacity tanks with required salt and
fresh water piping.
1
Each
Direct
Indirect
$5,362.76
7,163.34
ACID Talk BUILDING - Bldgs #120
One story wood and corrugated iron constructions rectangular shape; size 0.D.
6'20" x 12'-0" x 9'=O" high; set on a 5* thick concrete slab; piping; floor area
0.D. 96 sq. feet} cubic content 706 cubic feet; 240 gallon capacity redwood tank.
1
Each
Direct
Indirect
$751.7h,
475. hb
‘a
$339 48
$15,865.58
"Pp roration of
Charges to Units