“ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR
AS-BUILT ORAWING NUMBERS AND DATES:

10C-510

JOB NO.

640

3/23/51

CONTRACT NO.

For:

sneer wo.

Ss

AT~i 29~1 1-507

LOCATION

18

or 20

“Not for use by Ace Page 29eL
BUWIT ISLAND - SITE *c*

DATE OF THIS REPORT:

The Complete Construction of Sewer System

9

1958)

Bullding No.:

ESTIMATE
"Property
Aecount

DESCRIPTION OF PROPERTY UNITS

Quantity

Unit

Construction
Contract

Est'd, Value

Gove urn ished

-

giCost
nearing

.

Total

Tt

SENER SYSTEM
Consists of two underground Lines of 8 vitrified olay pips, total length 1,162
feet, 5 corrugated metal manholes, 500 feet of corrugated metal pipe outfall,
concrete anchor blocks spaced every 5O feet along the outfall, 316 feet of 6*
service branches, and one 6" drain line from the power house directly into the
lagoon.

+

1

Kach
Direct

Indirect

$9,071.37

6,073.10

$995.77

$16,140.5)