ATOMIC ENERGY COMMISSION
SANTA FE OPERATIONS OFFICE

OF0.436
12.00)

COMPLETION REPORT FOR

JOB NO.

AS-BUILT DRAWING NUMBERS AND DATES:

Foul

640 = k(e)

2/13/51

CONTRACT NO,
For:

_AT-1 29-4 1-507

S aes

sueet wo. 2)

or 20
Page 16

"Not for use by AE

LOCATION UNIT ISLAND - SITE "C"

DATE OF THIS REPORT:
13 February 1951

The Complete Construction of Carpenter Shop

.

Buliding No.: 123

ESTIMATE
"Property

DESCRIPTION OF PROPERTY UNITS

Account

Quantity

unit

Construction

Contract
Cost

Est'd.

Vaiue

Gov.Material
Furntshea!

Enal

Engineering
Cost

Total

CARPENTER
One story, wood frame, gable roof, enclosed on three sides only, plywood and

screen on sides, corrugsted aluminum roofing, erected on a 5" sonarete alab, sise

20'-O8 x yO0'-O0", 800 square feet, electrical power.

The sise I.D. 19'-8" wide

x 39'=k" long x 10'-8" high, with a cubic content of 8,255 ouble feet.
Installed equipment inoludes:

one generater set.

Two drills, one portable saw, one table sew, and

i

Each

Direct

Indirect

$518.96
298.95

*

$817.91

"Prorat

oroes to unite

Charges to Units