ATOMIC ENERGY COMMISS1ON
> °* SANTA FE OPERATIONS OFFICE
COMPLETION REPORT FOR

tots
AS-BUILT ORAWING NUMBERS AND DATES:
5-12

qt

JOB NO. G40 = k(e)

2/13/51

CONTRACT NO, _AT=(29~1)-507_
For:

PERT

.

LOCATION RUMIT ISLAMD - SITE "C*

suttt wo_20._

or 20
Page ls

Not for use by A-E

DATE OF THIG REPORF:

The Complete Construction of Paint & Tool Shed

13 February 1951

;

Bullding No.: 12h
ESTIMATE
“Propert

Account

DESCRIPTION OF PROPERTY UNITS

Number

Quantity

Unit

Construction

Contract
Cost

Est'a.

Value

Gov. Furnished
Material

Engineering

Total

.

Charges toUnite

a
PAINT & TOOL SHED
One story, wood freme, shed roof, sides ani roof covered with corrugated sheet

steal with exception of open front of paint shop, erected on a 5" concrete sleb,
wise 13'-8" x 30'-0", 410 square feet, o
te with electrical wiring end

fixtures.

The sise I.D. is 7'-h" wide x

oontent of 1,666 oubic feet.

29-4" long x 7'-9" high with a cubis

1

Keach
Direct

$265.97

LTie docum
the National

SHIPET

YDS a

&

*

jee

' “hited

Select target paragraph3